Similar Projects
Sisson Domestic Water Loop
Infrastructure
Bidding
$350,476 est. value
Columbus, OH

Forest Hill Avenue Water Main Replacement
Infrastructure
Bidding
$348,336 est. value
East Cleveland, OH 44112

Water and Sewer Maintenance Supplies, Hydrants and Meters
Post-Bid
Gallipolis, OH 45631

State Routes 7 and 148 Water Main Replacements
Post-Bid
Less than $125,000 est. value
Powhatan Point, OH 43942

Glyco II Forcemain Replacement - Contract A
Results
$1,639,924 est. value
Painesville, OH

Construction of Contract 9-19, South Defiance Street & Miller Avenue Waterline
Results
Less than $289,330 est. value
Archbold, OH 43502

Florida, Westmoreland, Williamson Water Main Replacement
Infrastructure
Bidding
Cincinnati, OH

Water Lines Replacements
Post-Bid
Coolville, OH 45723

Mink Pressure District Water Main Improvements and Harrison Road Storm Sewer Improvements
Results
Less than $3,450,000 est. value
New Albany, OH 43054

2nd Street Waterline Replacement
Infrastructure
Bidding
Byesville, OH 43723

Project Prevent Backflow
Post-Bid
Less than $300,000 est. value
Whitehall, OH 43213

Ductile Iron and Pipe Fittings Price Agreement
Term Contract
Results
Kettering, OH

Navarre Avenue Water Valve Improvements
Infrastructure
Bidding
$104,000 est. value
Oregon, OH 43618

Waterline Replacement
Post-Bid
Less than $138,700 est. value
Syracuse, OH 45779

Vitrified Clay and PVC Pipe
Results
Cleveland, OH 44114

Last Updated 09/21/2021 09:22 AM
Project Title

Hardin Pike Force Main Replacement

Physical Address View project details and contacts
City, State (County) Wapakoneta, OH   (Auglaize County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $524,687
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of replacing the existing 10” force main with 2,500 feet of new 16-inch force main.

Details

Division 02 - Existing Conditions.
Division 05 - Metals.
Division 09 - Finishes, Painting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents