Similar Projects
Minooka Ridge Business Park - Phase 1
New Construction, Infrastructure - 1,100,000 SF
Conception
$120,000,000 est. value
Minooka, IL

Administration Parking Lot Replacement - County of Grundy
Infrastructure
Conception
$650,000 CJ est. value
Morris, IL 60450

Morris Maintenance Storage Facility
Demolition, New Construction, Infrastructure
Bidding
$13,000,000 CJ est. value
Morris, IL 60450

Pilot Storage Building
Renovation
Post-Bid
Minooka, IL 60447

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

DNR Mazonia Braidwood SFWA New Pole Building
New Construction
Results
Braceville, IL

Lake Chaminwood Preserve - Phase II Improvements
Infrastructure
Results
$885,427 CJ est. value
Minooka, IL 60447

I-80 Logistics Park
New Construction, Infrastructure - 7,000,000 SF
Pending Verification
$700,000,000 CJ est. value
Minooka, IL 60447

Dupont Road Reseal - Grundy County
Infrastructure
Conception
$840,000 CJ est. value
Morris, IL 60450

Perform Various Operations on Brisbin Road
Infrastructure
Post-Bid
Morris, IL

Mazonia-Braidwood State Fish and Wildlife Area
Infrastructure
Results
$2,878,559 CJ est. value
Braceville, IL 60407

Kankakee Road over Granary - Grundy County
Infrastructure
Conception
$420,000 CJ est. value
Gardner, IL 60424

RFQ D/B - Grundy County Local Public Health Department Clinic
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Morris, IL 60450

Replace Superstructure Carrying Brisbin Road
Demolition, New Construction, Infrastructure
Results
$787,230 CJ est. value
Morris, IL 60450

Nettle Creek Bridge - Grundy County
Infrastructure
Conception
$420,000 CJ est. value
Morris, IL 60450

Last Updated 12/07/2022 08:43 PM
Project Title

dupeDemolish Buildings and Construct Building/Remodel Storage Building

Physical Address View project details and contacts
City, State (County) Morris, IL 60450   (Grundy County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $13,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

MBE/FBE Subcontracting and Supplier Goals Apply The 7 Bay Truck Storage Building (D0321) is a 10,368 square foot building constructed in 1955. The scope of work provides for an assessment for demolishing the existing 7 Bay Truck Storage Building (D0321) and constructing a new office-maintenance building, including foundations, footings and slabs, pre-engineered metal building system, steel structure, paving, site utility work, metal roof system, overhead doors, electrical systems, plumbing, fire-protection, communications systems and a heating and ventilation system. Office/administration area to include ready room, break room, locker rooms, toilet rooms, storage, mechanical and office areas. This building may include a vehicle maintenance area and provide wash bays, oil/water separator, vehicle lifts, oil/air dispensing reels, oil/lube areas, small equipment room, paint room, hazardous waste storage area and a parts and tool storage area. The work also provides for a new salt brine mixing and storage containment system with covered roof, including concrete pad and retaining walls. The Morris 5 Bay Truck Storage Building (D0322) is a 4,320 square foot building constructed in 1963. The scope of work provides for repairing and remodeling or replacing the 5 Bay Truck Storage Building (D0322) to allow for additional storage space. AE Estimate 13,000,000 The Morris site renovations will include demolition of some of the existing site structures to accommodate the new building, demolishing existing concrete material storage bins and replacing them with new material storage bins. Hauling debris and contaminated soils out of the maintenance yard will be required, as well as repairing the existing gravel pavement to assist with storm water drainage. The project will also affect site utilities.

Details

14,688 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents