Similar Projects
Mall of India Childcare Center
Build-Out, Alteration
Conception
Naperville, IL 60540

Arbor View Park Playground, Park Amenities, Pavement, and Drainage Improvements Project
Renovation, Infrastructure
Bidding
$386,000 est. value
Lisle, IL 60532

Sunset Knoll West Playground - Poured Rubber Resurface
Renovation
Bidding
$487,000 est. value
Lombard, IL 60148

Four Seasons Park
Post-Bid
Lombard, IL

Presidents Playground Equipment
Post-Bid
Wheaton, IL

Odlum Park Improvements
Results
$272,853 est. value
Roselle, IL

Commissioners Park 2021 Playground
Renovation
Results
Naperville, IL

The Oak Brook Commons Mixed Use
New Construction
Construction
$500,000,000 est. value
Oak Brook, IL 60523

KLA School
New Construction, Build-Out - 21,824 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Naperville, IL 60564

Artificial Turf and Track Replacement at West Chicago Community HS
Post-Bid
West Chicago, IL 60185

Tennis Court Surface Repairs
Results
Downers Grove, IL 60516

Highland Elementary Playground
Renovation
Post-Bid
Downers Grove, IL 60515

Central Park Pickleball Courts
Renovation
Results
Wheaton, IL 60187

Timberwoods Park Playground Equipment Installation
Renovation
Post-Bid
Addison, IL

2021 Playground
Renovation
Results
Naperville, IL

Last Updated 04/27/2022 01:27 AM
Project Title

2022 Wilder Park North Tennis Courts Improvements

Physical Address View project details and contacts
City, State (County) Elmhurst, IL 60126   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes removing and re-installing the existing fencing, full depth removal of the playing surface, installing a new asphalt playing surface with appropriate surface and striping as well as the provision and installation of new nets and backboard.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents