Similar Projects
Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

Salt Lake City ATCT CRAC Unit Upgrades
Term Contract
Post-Bid
Salt Lake City, UT

J041--660 - (S4) ** EMERGENT** Air Handler Repair Bldg 2 AHU Repairs
Term Contract
Results
Salt Lake City, UT 84148

SLCO ADC AHU Replacement
Term Contract
Results
$900,000 to $950,000 est. value
South Salt Lake, UT 84119

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Post-Bid
Salt Lake City, UT

Animal Shelter Boiler and Water Heater
Alteration
Results
South Salt Lake, UT 84115

Airport Operations Center HVAC
Alteration
Post-Bid
Salt Lake City, UT 84122

729 AR Data Room AC Replacement
Term Contract
Results
$105,000 est. value
Salt Lake City, UT

University Of Utah Generator And Switches
Term Contract
Post-Bid
Salt Lake City, UT 84112

DFCM Construction-Pre Qualified Mechanical-UNG Draper CSMS HVAC Repairs
Alteration
Results
$183,425 est. value
Draper, UT 84020

BEH S 025 AHU 1 System Upgrade
Alteration
Post-Bid
$190,217 est. value
Salt Lake City, UT 84112

DFCM Construction-Pre Qualified Mechanical-UNG Draper SCIF HVAC Upgrades
Alteration
Results
$183,425 est. value
Draper, UT 84020

Install Rooftop HVAC Units
Alteration
Post-Bid
Riverton, UT

Potable Reuse Demo Facility Project - HVAC/Mechanical
Alteration
Results
Bluffdale, UT 84065

4200 Pump Station Air Conditioning
Alteration
Post-Bid
Riverton, UT 84096

Last Updated 12/27/2022 11:32 PM
Project Title

FLD H SW Chiller Plant - Add Chiller - Phase 9

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84112   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,078,703 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be in accordance with the Contract Documents prepared by University of Utah U Facilities and Focus Mechanical Consulting PLLC, hereinafter referred to as "A/E" as defined in the General Conditions. Scope of Work: Installation of the 3rd chiller in the south west chiller plant. Effective September 10, 2018, the University has retired the previous state mandated Surety Bond Forms and is now requiring the use of the AIA Bid Bond Form A310-2010 and Performance and Payment Bond Form A312-2010. ALL QUESTIONS MUST BE UPLOADED THE UNIVERSITY IS NOT RESPONSIBLE FOR DIFFICULTIES, TECHNICAL OR OTHERWISE, ASSOCIATED WITH THE ELECTRONIC BIDDING PROCESS. BIDDERS WHO CHOOSE TO USE THE ELECTRONIC BIDDING PROCESS DO SO AT THEIR OWN RISK. Persons or companies bidding on this project shall hold a current Utah Contractor's License covering the type of work to be done and shall be bondable to the amount of the Contract. A bid bond in the amount of five percent (5%) of the bid amount, made payable to The University of Utah, must be procured and submitted to the University of Utah within 24 hours after the bid due time. The bid bond may be scanned and submitted with the online bid via www.bidsync.com at the time of the bid. Construction Constraints: None Q & A deadline: Nov 04, 2022 6:00:00 PM EDT The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University. THE UNIVERSITY OF UTAH, U FACILITIES, TERESSA PICKETT, CONTRACT ADMINISTRATOR Construction Budget: $1,275,000

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents