Similar Projects
Platteville High School Improvements
Renovation - 13,500 SF
Conception
Platteville, WI 53818

Saint Augustine Preparatory Academy Expansion
Addition - 11,000 SF
Design
Milwaukee, WI 53207

Maple Road Proposed Subdivision
New Construction
Design
Jackson, WI 53037

Lake Country School District Boilers
Renovation
Bidding
Hartland, WI

2022 Summer Building Improvements
Renovation
Bidding
Big Bend, Eagle, Mukwonago, North Prairie, WI 53103

Parkside Elementary School Bid Package 1
Renovation, Addition
Post-Bid
Fond du Lac, WI 54935

FEMA Safe Room & Link
Addition
Post-Bid
Spencer, WI 54479

Hamilton Elementary
Renovation, Addition - 18,000 SF
Results
La Crosse, WI 54601

2021 Elementary School Renovation
Renovation
Results
New Holstein, WI 53061

Stateline Boys and Girls Club
New Construction, Renovation - 22,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

Oriole Lane Elementary School
New Construction
Construction
Mequon, WI 53097

National Heritage Academies
New Construction - 45,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Waukesha, WI 53189

Saint Ambrose Academy
New Construction, Addition - 44,582 SF
Design
Fitchburg, WI 53711

Sabish Middle School
Renovation
Post-Bid
Fond du Lac, WI 54935

Elk Mound High School Phase 1 Additions and Phase 2 Remodel
Renovation, Addition
Results
Elk Mound, WI 54739

Last Updated 02/24/2022 03:08 PM
Project Title

Lourdes Academy

Physical Address View project details and contacts
City, State (County) Oshkosh, WI 54902   (Winnebago County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method
Project Status Construction Commenced November 2021, Construction Completion Expected August 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Elementary School, 9,138 SF Addition, Middle/Senior High School, 18,073 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents