Similar Projects
Last Updated | 06/05/2020 12:36 PM |
Project Title | 2020 Vermillion Storm Drain |
Physical Address | View project details and contacts |
City, State (County) | South Jordan, UT 84095 (Salt Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Schedule A: The Work to be performed for this schedule is located at Vermillion Drive, approximately between 4435 W and 10465 S, South Jordan, and generally includes the Furnishing and Installation of Storm Drain Pipe, but it is not limited to, Demolition, Site Preparation, Surveying, Material Sampling and Testing; Furnishing and Installation of Storm Drain Pipe; Furnishing and Installation of Storm Drain Basins, Inlet Grates, and Storm Drain Markings; Furnish and Installation of Storm Drain Manholes and Manholes Lids; Connection to Existing Storm Drain System; Abandon Inlets and Pipe to Existing Ponds; Demolition, Removal and Disposal of Existing Concrete Curb & Gutter Sections; Construction of Concrete Curb & Gutter; Asphalt Repair; Repair of Sprinkler System and Landscape Repair; Quality Control; All Labor, Supplies, Tools, Equipment, Parts, Rentals, Fuels, Utilities, Subcontractors, Suppliers, Mobilization and all other Costs including Overhead and Profit. Schedule B: The Work to be performed for this schedule is located at several locations; Clarks Hill Drive and Vermillion Drive, Greers Ferry Way and Vermillion Drive, Martings Drive and Vermillion Drive, Lac Vieux Road and Vermillion Drive; in South Jordan, and generally includes the Furnishing and Installation of Storm Drain Pipe, but it is not limited to, Demolition, Site Preparation, Surveying, Material Sampling and Testing; Furnishing and Installation of Storm Drain Pipe; Furnishing and Installation of Storm Drain Basins, Inlet Grates, and Storm Drain Markings; Furnishing and Installation of Storm Drain Manholes and Manholes Lids; Connection to Existing Storm Drain System; Abandon Inlets and Pipe to Existing Ponds; Demolition, Removal and Disposal of Existing Concrete Curb & Gutter Sections; Construction of Concrete Curb & Gutter; Asphalt Repair; Repair of Sprinkler System and Landscape Repair; Quality Control; All Labor, Supplies, Tools, Equipment, Parts, Rentals, Fuels, Utilities, Subcontractors, Suppliers, Mobilization and all other Costs including Overhead and Profit. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |