Similar Projects
Schedule A: Water and Wastewater Main Replacements at Various Locations, and Schedule B: University Hills Boulevard Wastewater Main Installation, and Schedule C: Luna Road from Northwest Highway to Royal Lane Water and Wastewater Main Replacements
Bidding
Dallas, TX

Fireside by the Lake, Phase 1 - Utility Improvements
Bidding
Dallas, TX 75043

Advance Metering Infrastructure (AMI) Water Meters
Post-Bid
Glenn Heights, TX 75154

Water Pipeline Construction Project for Vitruvian Park Trinity Aquifer Well
Post-Bid
Addison, TX 75001

Part 1 - Water and Wastewater Main Improvements in Ash Creek, Cedar Springs Branch, and Ledbetter Drive, Part 2 - 54" Azalea Drainage Relief Improvements
Results
$9,641,340 est. value
Dallas, TX 75216

Utility Relocation for CSJ 0430-01-057 SH 352
Results
$264,313 est. value
Mesquite, TX 75149

Utilities Contractor for a Construction Project
Post-Bid
Irving, TX

River Oaks, Cameila and Fair Court Water Improvements
Results
$739,568 est. value
Irving, TX 75014

State Highway 161 Water Improvements
Post-Bid
Irving, TX 75038

Wilmer Water System Improvements Segment 1
Results
$1,911,078 est. value
Wilmer, TX 75172

The Mesa Water Distribution Improvements
Post-Bid
Glenn Heights, TX

Silverado Phase 3-MI, 4B-2 MI, 5-MI and Valley Storage Pond Water, Sanitary Sewer and Storm Drainage Improvements
Results
Dallas, TX

Belt Line Road Valve Improvement at Plano Road and Yale Boulevard
Post-Bid
$487,000 est. value
Richardson, TX 75080

Silverado Phase 5A Water, Sanitary Sewer and Storm Drainage Improvements
Results
$1,204,387 est. value
Dallas, TX

Snider Plaza Utility Replacement
Post-Bid
$5,300,000 to $6,000,000 est. value
University Park, TX

Last Updated 12/17/2019 10:07 AM
Project Title

A/R/C: Utility Repair and Replacement

Physical Address View project details and contacts
City, State (County) Richardson, TX 75080   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair or replace approximately twenty (20) to forty (40) hydrants per year, fire hydrant leads up to fifteen feet (15’) in length, and fire hydrant control valves. The City may, on an as needed basis, assign approximately ten (10) double (two-way) clean out installations annually.

Details

Division 33 - Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents