Similar Projects
Last Updated | 06/26/2023 07:16 PM |
Project Title | Pepertuation - Pavement Replacement - IH 41 - N 9Th Street - Wisconsin Department of Transportation |
Physical Address | View project details and contacts |
City, State (County) | Ashwaubenon, WI 54304 (Brown County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected August 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 26, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Project ID Project Name Route County Limit 4161-03-00 ASHLAND AVE, C DE PERE STH X041N 05 - Brown County IH 41 - N 9TH STREET The pavement needs replacement, structures need treatment to extend their service lives, and drainage needs improvement. Perpetuation project to replace the pavement of 0.31 mile of STH X041, Ashland Ave, extending from IH 41 to 9th Street in the city of De Pere in Brown County. Repair wing wall on C-5-0005 & concrete overlay of B-05-0120. Project will include pavement replacement, bridge deck concrete overlay, culvert repair, box culvert wing wall repairs and beam guard upgrades. Major tasks include final scope certification, preliminary structure and roadway design, environmental documents, final structure and roadway design, plat development, and PS&E package delivery. Anticipated Construction Cost: $1,000,000-$1,999,999 Advertised Fixed Fee %: 7.25 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Pepertuation - Pavement Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |