Similar Projects
Widen and Resurface - US277
Infrastructure
Conception
$3,500,000 CJ est. value
Lawton, OK 73501

Bridge and Approaches - SH 49
Infrastructure
Design
$898,190 CJ est. value
Lawton, OK 73507

Construction of Adjacent Parking Lot
Infrastructure
Design
$467,000 CJ est. value
Lawton, OK 73501

New Baseball/Softball Facilities - Bid Packages 1 to 15
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Elgin, OK 73538

Sterling Public School Parking Lots and Streets Project in District 1
Infrastructure
Post-Bid
$300,000 CJ est. value
Sterling, OK 73567

Resurface (Asphalt) - US-62
Infrastructure
Results
$6,267,045 CJ est. value
Lawton, OK 73505

Resurface (Asphalt) - SH-49
Infrastructure
Results
$2,681,693 CJ est. value
Medicine Park, OK 73507

Grade, Drain and Surface - US 277
Infrastructure
Design
$3,710,000 CJ est. value
Lawton, OK 73501

Water System Improvements Water Supply Main Control Valve Station
Infrastructure
Post-Bid
$62,000 CJ est. value
Geronimo, OK 73543

Bridge and Approaches - SH 17
Infrastructure
Results
$12,482,685 CJ est. value
Elgin, OK 73538

Bridge and Approaches - SH 7
Infrastructure
Design
$2,317,417 CJ est. value
Lawton, OK 73501

Lawton WWTP Improvements Phase 1
New Construction, Renovation, Infrastructure
Post-Bid
$88,000,000 CJ est. value
Lawton, OK 73501

Cache Road Waterline Replacement Project - 12-inch Waterline NW 40th Street to NW 6th Street
Infrastructure
Results
$6,049,205 CJ est. value
Lawton, OK 73505

Interchange - US 62
Infrastructure
Design
$16,000,000 CJ est. value
Cache, OK 73527

Bishop Public School - New Middle School
New Construction, Infrastructure - 20,043 SF
Post-Bid
$8,400,000 CJ est. value
Lawton, OK 73505

Last Updated 08/11/2023 12:31 PM
Project Title

North Water Well Project

Physical Address View project details and contacts
City, State (County) Lawton, OK 73501   (Comanche County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,173,271 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

DWSRF negotiated DBE participation goals with EPA of 11.25% for MBEs and 7.41% for WBEs. The DBE goals are not a quota Work consists of drilling 600' deep waterwell with 8" casing including submersible pump and appurtenances. Also included is plugging existing well. All bids received at said time shall be publicly opened and read aloud. All work shall be performed and all construction and material used and furnished shall be in accordance with the Plans and Specifications prepared by Jung Engineering , and on file in the office of the Fletcher PWA The Notice to Bidders, Form of Bid, Form of Contract, Plans and Specifications, Forms of Bid Bond, Performance and Statutory Payment Bond, and other Contract Documents may be examined at the following: 1. Fletcher PWA 423 W. Cole Avenue P.O. Box 448 Fletcher, OK 73547 2. Jung Engineering 3 NW Eagle Road Lawton, OK 73507 Each bidder shall accompany his original bid, with a certified or Cashier's Check on a solvent bank located in Oklahoma or a Bidder's Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said plans and specifications and furnish the required bonds within ten (10) days after the acceptance of his bid. The deposit will be retained by the Owner as, and for, liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. Each bidder shall accompany his bid with a DW-412 Noncollusion Affidavit and a DW-413 Business Relationships Affidavit in writing displaying that the Bidder has not directly or indirectly entered into an agreement, express of implied, with any other bidder or the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof. Performance, Maintenance and Statutory Payment Bonds in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract. A Maintenance Bond guaranteeing the repair of all damage due to improper materials or workmanship for a period of one (1) year, after the acceptance of the work by the Owner, will be required. This project is to be financed by a loan from the Oklahoma Water Resources Board through the Department of Environmental Quality Drinking Water State Revolving Fund (DWSRF) and shall be referred to as DWSRF Project No. P40-2001612-01. A. "Equal Opportunity in Employment: All qualified applicants will receive considerations for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications." B. "Each bidder must fully comply with the requirement, terms and conditions of the Department of Environmental Quality Small, Minority, Women's Businesses Requirements including affirmative steps to contract with small, minority and women's businesses during the performance of this contract. The bidder commits itself to the affirmative steps to contract with small, minority and women's businesses contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in DEQ Guidance and Procedures, DW-700." C. "All bidders must comply with the Anti-Kickback Act and the Contract Work Hours Standards Act." D. "Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub- contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. For more information please refer." F. American Iron and Steel provisions also apply to projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the "Consolidated Appropriations Act, 2014". Sec. 436(a)(1) of the act states that "None of the funds made available by a State Water Pollution Control Revolving Fund as authorized by Title VI of the Federal Water Pollution Control Act (33 U.S.C 1381 et seq.) or made available by a Drinking Water Treatment Revolving Loan Fund as authorized by Section 1452 of the Safe Drinking Water Act (42 U.S.C. 300j-12) shall be used for a project for the construction, alteration, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States." G. This project is subject to Build America, Buy America (BABA) Act requirements. The BABA Act requires none of the funds made available for a Federal financial assistance program for infrastructure, including each deficient program, may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States. The BABA Act requirement does not supersede the AIS requirement, and both provisions shall apply and work in conjunction. H. System for Award Management (SAM) registration is required for all DWSRF program applicants and Awardees (Entities, prime contractors, subcontractors, vendors) in order to be awarded contracts by the DWSRF program. SAM replaces Central Contractor Registration/Federal Agency Registration, Online Representations and Certifications Application, and Excluded Parties List System. Applicants and awardees are required to complete a one-time free registration to provide basic information relevant to procurement and financial transactions. New Applicants and awardees please go to Sam.gov to complete the registration process. Note: In order to register in SAM, a Data Universal Number System (DUNS) number will be required. DUNS number is a unique, non-indicative 9-digit identifier issued and maintained by Dun & Bradstreet (D&B) that verifies the existence of a business entity globally. D&B assigns DUNS numbers for each physical location of a business. All entities doing business with the U.S. Government can receive a DUNS number FREE of charge and, under normal circumstances, within 1-2 business days when using the D&B web form process at http://fedgov.dnb.com/webform The bids filed with the Fletcher PWA will be considered by the Fletcher PWA, at a meeting to be held at 423 W. Cole Avenue, Fletcher, Oklahoma at 6:30 pm Local on the 8th day of August, 2023 but all bids shall remain on file at least forty-eight (48) hours thereafter before a contract will be made and entered into thereon. Bids received more than ninety-six (96) hours prior to the Bid Opening will be returned. A pre-bid conference will not be held on this project. However, any prospective bidder may visit the project site and/or request additional information from Mr. Alvin R. Jung, P.E., Jung Engineering, 3 NW Eagle Road, Lawton, OK 73507, (580)361-8675, ajungpe@gmail.com prior to the bid opening. The contract is to be awarded to the lowest responsive, responsible bidder. The responsible bidder. The Owner reserves the right to waive any informalities in the bidding and the right to reject any and all bids in accordance with the Oklahoma Competitive Bidding Act. Conditional bids shall not be accepted

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents