Similar Projects
Wastewater Treatment Facility Expansion
Addition
Design
$12,000,000 to $12,300,000 est. value
Owatonna, MN 55060

WLSSD Wastewater Treatment Facility
New Construction
Bidding
Duluth, MN

Wastewater Treatment Facility Improvements
Renovation
Bidding
Saint James, MN

MWWTP Services Buildings and Site Improvements - Step 1
New Construction
Post-Bid
$35,000,000 est. value
MN

Empire WWTP Solids Improvements Phase II
New Construction
Post-Bid
Farmington, MN 55024

MCES Rogers Modifications
Renovation
Results
Rogers, MN 55374

Wastewater Treatment Facility
Results
Chisago City, MN 55013

Regional Wastewater Treatment Facility - Contract 1
New Construction
Bidding
Oronoco, MN

Onsite Sanitary Treatment System Scenic State Park
Renovation
Post-Bid
$2,325,112 est. value
Bigfork, MN 56628

Wastewater Treatment Facility Improvements
Results
$1,800,000 to $2,000,000 est. value
Madelia, MN

Wastewater Treatment Facility Improvements
Renovation
Bidding
Lakefield, MN

Pre-CHP - Mist Elimination Improvements
Renovation
Post-Bid
Duluth, MN

2021 Wastewater Treatment Facility Improvements
Addition
Results
$10,000,000 est. value
Melrose, MN

Phosphorus Reduction System
New Construction
Post-Bid
Dennison, MN

2021 Odor Control Media Procurement
Results
Saint Paul, MN

Reported 08/04/2021 12:00 AM
Project Title

Wastewater Treatment Facility

Physical Address View project details and contacts
City, State (County) Caledonia, MN   (Houston County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract is generally described as general construction of wastewater treatment facility buildings and basins including site work, yard piping, structural, architectural, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical, and instrumentation and control. The Work of this Contract includes the construction of the following structures: 1. Preliminary Treatment Building – Consisting of Fine Screening and Grit Removal. 2. Equalization and Pumping Wet well – The existing SBR system is to be converted into equalization tanks with a Pump Wet well constructed into the existing equalization tank. A valve vault will be constructed adjacent to the Pumping Wet well. 3. Oxidation Ditch – Includes a selector basin for filament control and a three ring oxidation ditch for biological treatment of BOD and nitrogen. 4. Secondary Clarifiers – Circular clarifiers to settle out biomass and collect biomass to control the sludge retention time. 5. UV Disinfection – Structure includes open channel UV equipment for treatment of pathogens before discharge. 6. Solids Building – Structure consisting of solids thickening, chemical feed systems and process pump equipment. 7. Admin. Building – Structure consisting of office space, lab equipment and garage space. 8. Bid Alternate 1 – Cold Storage Building – Pre-engineered building for mechanical equipment storage. 9. Bid Alternate 2 – Demolish Existing Treatment Plan Structures. 10. Bid Alternate 3 - Aluminum Conductors for Major Power Feeders.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents