Similar Projects
Flooring Project at Covina and Northview High Schools
Renovation
Sub-Bidding
$90,000 CJ est. value
Covina, CA 91723

Swimming Pool Tile and Lights Repair Services at Arcadia High School
Renovation
Sub-Bidding
$200,000 CJ est. value
Arcadia, CA 91006

Flooring Services
Alteration
Post-Bid
CA

Epoxy Flooring Installation Project at the South El Monte High School Kitchen
Alteration
Post-Bid
$90,000 est. value
South El Monte, CA 91733

Flooring for Desert Housing
Term Contract
Results
CA

Flooring Removal, Concrete Staining and Polishing at a City-Owned Building
Term Contract
Results
$20,500 est. value
San Fernando, CA

UCLA MP 100 Suite 100 CT/MRI Replacement Bid Package #06 - Flooring - Re-Bid
Renovation
Post-Bid
$4,450,000 CJ est. value
Los Angeles, CA 90024

Flooring Services
Alteration
Results
CA

Floor Repair and Refinishing Maintenance
Renovation
Post-Bid
$70,000 CJ est. value
Los Angeles, CA 90012

Floor Renovations at Beverly Vista and Hawthorne Schools
Alteration
Results
$200,000 est. value
Beverly Hills, CA

Flooring - Black Smooth Transit, Yd Roll
Term Contract
Post-Bid
Los Angeles, CA 90012

FY22-23 Annual Paving Project
Infrastructure
Results
$5,594,423 CJ est. value
Santa Monica, CA 90401

Carson City Hall 1st Floor Carpeting
Renovation
Post-Bid
$90,000 CJ est. value
Long Beach, CA 90807

Senior Center Flooring Replacement
Renovation
Results
$95,910 CJ est. value
Duarte, CA 91010

RFP for Roller Hockey Rink Floor Resurfacing
Renovation
Post-Bid
$70,000 CJ est. value
Torrance, CA 90501

Last Updated 04/17/2023 09:44 AM
Project Title

Terrazzo Flooring Replacement

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90095   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status All Bids Rejected, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $405,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 14, 2023, all bids for this project has been rejected. At this time, it has not been confirmed if the project will be rebid. Contractor shall provide all the labor, materials and equipment for the demolition and installation of new terrazzo flooring at the lobby and first floor stair at De Neve Cedar, Dogwood, Evergreen and Fir residential buildings. The University currently anticipates Phase 1 to begin no sooner than June 19, 2023 and to be completed no later than July 31, 2023, and Phase 2 to begin no sooner than August 1, 2023 and to be completed by August 31, 2023. The work will be performed when the buildings are unoccupied, during Summer 2023. One tap mobile +12133388477, 98670287466# US (Los Angeles) +16692192599, 98670287466# US (San Jose) Dial by your location 1 213 338 8477 US (Los Angeles) 1 669 219 2599 US (San Jose) 1 971 247 1195 US (Portland) 1 253 215 8782 US (Tacoma) 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami) Find your local number: https://ucla.zoom.us/u/adJIVaI7XH The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements.

Details

12 Stories Above Grade, 2,878 SF.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents