Similar Projects
Stairwell Pressurization MEP
Alteration
Bidding
$987,000 est. value
Madison, WI 53706

Van Hise Hall Stairwell Pressurization GPC
Alteration
Bidding
$2,078,400 est. value
Madison, WI 53706

HVAC and Mechanical Products
Term Contract
Post-Bid

NWHC Replacement of Air Handling Unit - FS-06
Post-Bid
Madison, WI

HVAC Improvements
Results
$203,000 est. value
Madison, WI

Air Handling Units Replacement
Results
$210,000 est. value
Madison, WI

Supply, Delivery and Incidental Install of LP Gas Heated Pressure Washers for the Nine Federal Flood Risk Management Structures (Fox River Dams), Wisconsin
Post-Bid

HVAC Annual Preventative Maintenance
Results
Madison, WI 53704

Heating Systems Repair/Replace, Clean & Tune
Alteration
Post-Bid

BPHCC HVAC RTU Modifications
Alteration
Results
Verona, WI 53593

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Food Service HVAC Improvements - MEP
Alteration
Results
$1,675,000 est. value
Madison, WI

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

Food Service HVAC Improvements - GPC
Alteration
Results
$1,675,000 est. value
Madison, WI

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Reported 06/27/2022 08:46 AM
Project Title

Air Compressor #3 Replacement - Walnut Street Heating Plant

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Schematic Drawings
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of interconnecting piping and instrumentation conduit and cabling and low voltage power conduit and cabling to a new air compressor provided and installed by the University. Piping to be installed includes process air piping, lake water (cooling water) supply and return piping, and compressor drain piping. Electrical work consists installation of a 480V power feed to the compressor and installation of instrumentation and control wiring to the new compressor and system instruments. Existing air compressor demolition and removal, new housekeeping pad, and new air compressor package including setting of unit in place will be completed by the University. A 480V fused disconnect switch and breaker will be supplied by the University.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents