Similar Projects
Parking Area Reconstruction
Infrastructure
Design
$1,300,000 CJ est. value
White Salmon, WA 98672

Parking Area Reconstruction
Infrastructure
Design
$1,300,000 CJ est. value
White Salmon, WA 98672

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

The Goldendale Energy Storage - Columbia River Gorge
New Construction, Infrastructure
Pending Verification
$2,400,000,000 CJ est. value
Goldendale, WA 98620

Architectural Design Services for New County Services Building
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Goldendale, WA 98620

SR 14/1.6 Miles West of Cook-Underwood Rd - Slope Stabilization
Infrastructure
Design
$420,000 CJ est. value
Cook, WA 98605

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

SR 142, Lyle to Little Klickitat River BR Chip Seal
Infrastructure
Results
$2,500,000 to $3,000,000 est. value
WA

SR 141 / 141 Spur Vic to Northwestern Lake Rd Vic - Stormwater retrofit
Infrastructure
Design
$350,000 CJ est. value
White Salmon, WA 98672

RFQ Contractor - The Dalles Lock and Dam Lamprey Improvement-LPS Ladder
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Blockhouse, WA 98620

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

SR 142 / Melissa Creek Vic to 1 mile S of Klickitat River Bridge Vic
Infrastructure
Design
$332,000 CJ est. value
Goldendale, WA 98620

Last Updated 02/17/2023 10:33 PM
Project Title

Transmission Main Replacement Phase 1

Physical Address View project details and contacts
City, State (County) White Salmon, WA 98672   (Klickitat County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $6,805,154 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes installation of approximately 12,500 linear feet (LF) of 16-inch diameter ductile iron pipe or nominal 18-inch diameter HDPE pipe (depending on which bid option is selected); an aboveground creek crossing with 12-inch diameter ductile iron pipe in 24-inch diameter steel casing; valves, vaults, and appurtenances; surface restoration; and other miscellaneous work required to complete the Project as shown on the Drawings and as specified. The Work may include three Additive Alternates that includes the installation of approximately 13,300 LF of 2-inch conduit and 22 communication vaults; installation, termination, and testing of approximately 14,800 LF of fiber optic cable; and other miscellaneous work. All work shall be substantially completed within 250 calendar days and the completion date for all work and readiness for final payment within 280 calendar days after the date the Contract Times commence. The Contractor will be subject to the Washington State Prevailing Wage Rates for Public Works Projects, EEO, Washington State Contracting Laws, etc. All Contractors participating in the Work must be licensed in the State of Washington to conduct business. This Project is being funded in part through USDA Rural Development and Washington State Public Works Board program with state funds. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, and Pig iron and direct reduced iron. Est. Value Notes: $3.8 to $4.2 Million Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results BID OPTION A - North Cascade Excavating, LLC - $32,86,356 BID OPTION B - James Dean Construction - $3518798

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents