Similar Projects
Last Updated | 03/03/2023 10:03 AM |
Project Title | Edna High School CTE Additions and Renovation |
Physical Address | View project details and contacts |
City, State (County) | Edna, TX 77957 (Jackson County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $4,747,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of March 3, 2023 project has been rejected. As of this time it is unknown if and when project will rebid. PN-2145000AR The Owner reserves the right to reject any and all proposals and to waive any irregularities in the Competitive Sealed Proposal process No proposal shall be withdrawn within 30 days after the proposal opening without the specific consent of the Owner. PROPOSAL BOND: A Proposal Bond from a bonding company acceptable to the Owner or a certified check in an amount equal to 10% of the greatest amount proposal shall accompany each Offeror's proposal. PAYMENT BOND AND PERFORMANCE BOND: A Payment Bond and Performance Bond, each in an amount equal to 100% of the Contract Sum conditioned upon the faithful performance of the Contract will be required. Please note that all bonding companies presented must be acceptable to the Owner. The prevailing rates of wages are the minimums that must be paid in compliance with applicable laws of the State of Texas. Offerors submitting a proposal are encouraged to visit the site. All Offerors submitting a proposal are encouraged to attend the proposal opening. Subcontractors and Suppliers intending to submit proposals to General Construction Offerors are required to prepare proposals based on a complete set of proposal documents. If after reviewing the complete set of proposal documents, Subcontractors and Supplier Offerors desiring to purchase individual drawings and specification sections for their proposal convenience, may do so by ordering the specific drawings and specifications directly from the reproduction company. Subcontractors and Suppliers purchasing a partial set of proposal documents are responsible for determining the documents it requires and is responsible for costs associated with printing and delivery. Subcontractors and Suppliers exercising this option shall agree that 1) all documents shall be returned to the Architect, without refund, after submitting a proposal, 2) the documents shall not be used on other construction projects, and 3) that the subcontractor or supplier agrees that the Owner and the Architect have no responsibility for errors or interpretations resulting from the use of incomplete set of proposal documents. Successful Subcontractors and Supplier Offerors may retain their Proposal Documents until completion of the construction The Work shall consist of select demolition, approx. 12,900 sq. ft. New Addition to the existing Ag Facility. Alternate No. 1 Renovation to existing Science Building. Alternate No. 2 Installation of new aluminum canopy at Ag Facility. B. New work and renovations work as described in the Construction Documents and Specifications C. Salvaged Materials 1. Owner may salvage all items deemed reusable or necessary to keep from facilities to be demolished prior to the start of demolition. 2. Contractor shall remove and turn additional items over to the Owner, as directed. 3. Contractor shall demolish, remove, and salvage all other items of demolished work. |
||||||||||||||||||||||||||||||||||||||
Details | 12,900 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |