Similar Projects
Construct Wildlife Shop Facility
New Construction, Infrastructure
Conception
$1,970,900 est. value
Waukesha, WI

Store-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

Maple Centre - Phase 2
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Mukwonago, WI 53149

Bike Path
Term Contract
Post-Bid
Brookfield, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bay Lane ES Parent Drop Off Drive
Infrastructure
Results
Muskego, WI 53150

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Construction
$9,500,000 CJ est. value
Waukesha, WI 53189

ABB Inc. Headquarters
New Construction, Infrastructure - 301,320 SF
Construction
$161,000,000 CJ est. value
New Berlin, WI 53146

Atlas Metals Parts Co Expansion
Addition, New Construction, Infrastructure - 4,900 SF
Pending Verification
$260,000 CJ est. value
Waukesha, WI 53186

2023 Road Program: Utility Repairs And Roadway Resurfacing Professional Services
Infrastructure
Post-Bid
Sussex, WI

Water Hydrant
Infrastructure
Results
North Prairie, WI 53153

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

2022 Road Program, Contract 1-2022
Infrastructure
Post-Bid
$418,839 CJ est. value
Brookfield, WI 53005

Pewaukee-Brookfield Multi-use Path
Renovation, Infrastructure
Results
WI

Last Updated 05/09/2023 12:08 PM
Project Title

IH 94 East West Freeway, Moorland I/C, IH 094

Physical Address View project details and contacts
City, State (County) Waukesha, WI 53072   (Waukesha County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

20230509004 1060-10-72 IH 94 East West Freeway, Moorland I/C, IH 094 Waukesha County Excavation, Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Storm Sewer, Guardrail, Fencing, Signs, Pavement Marking, Street Lights, Traffic Signals, Bridge Rehabilitations. Work Type: AK Estimated Range - $3,000,000 - $3,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - IH 94 East West Freeway, Moorland I/C, IH 094 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents