Similar Projects
Emergency Generator Maintenance Services
Alteration
Bidding
Ferguson, Saint Louis, MO 63145

Ceiling Replacement Project
Alteration
Bidding
Bella Villa, MO 63125

Hubbell LED Troffers Lighting
Post-Bid
Saint Louis, MO

Cold Aerosol ULV Generator
Alteration
Post-Bid
Olivette, MO 63132

Led Light Pole Fixtures
Results
Ballwin, MO

Grand Glaize WWTF Transformer and Gate Replacement
Alteration
Results
Saint Louis, MO

Replacement of Lighting
Alteration
Post-Bid
Florissant, MO 63031

Caulks Creek Pump Station B (P-751) Generator Installation (IR)
Alteration
Results
$174,000 est. value
Chesterfield, MO 63017

JC Penney Building Replace South Electrical Switch Gear
Alteration
Post-Bid
Less than $195,000 est. value
Saint Louis, MO 63121

Clinton Peabody Emergency Lighting Repairs
Alteration
Results
Saint Louis, MO 63104

Joseph Sappington Log Cabin Transportation & Relocation
Alteration
Post-Bid
Crestwood, MO

Fiberglass Handrail System
Alteration
Results
Saint Louis, MO

Sealant Replacement Argyle Garage
Alteration
Post-Bid
Saint Louis, MO 63119

Rab Lighting, High Bay Light Fixtures
Alteration
Post-Bid
Saint Louis, MO

Electrical - On Call Maintenance and Repair Services
Term Contract
Post-Bid
Crestwood, MO

Last Updated 03/01/2022 10:24 AM
Project Title

Affton Senior High and Gotsch Intermediate School Maintenance Upgrades of Ceilings and Lighting

Physical Address View project details and contacts
City, State (County) Affton, MO 63123   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) Electric, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work by the contractor includes all labor, materials, and equipment necessary to complete all work. s. It is intended that the contractor shall provide a working installation complete in every detail and all items necessary for such complete installation shall be furnished. All work to be performed in a thorough and professional manner by mechanics skilled in their respective trades, using materials specified, or materials approved by the school district as equal in quality, capacity, and performance to those specified. d contractor to install new ACT ceilings and Lighting at Affton High School and Gotsch Intermediate School. Scope includes demolition of existing ceilings, lighting and rework of HVAC ductwork and other items/devices as noted on attached floor plans.

Details

Division 09 - Finishes.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents