Similar Projects
Reported | 05/13/2020 12:00 AM |
Project Title | Roadway Bank Stabilization Project along Wickham Falls Road |
Physical Address | View project details and contacts |
City, State (County) | Towanda, PA 18848 (Bradford County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project will be approximately 300 feet (+/-) in length, 12-16 ft. in height, 6-10 ft. in width, material will be Large Rock, STACKED to road grade. Stacked rock will be anchored with a "Core Trench". Additionally the replacement of a drainage culvert pipe will need to be done, this will be completed with an 18" Smooth Bore plastic, PENNDOT approved pipe, (supplied by the Township) after replacement of pipe, and ditch fill will be compacted "modified material" to eliminate settlement. Ditch work and NLT #3 rock will be placed at the "head wall" of the pipe. The roadway will need to be repaired, with 2RC/2B material, and graded to Township specifications upon completion. The project will include all equipment needed to place rock, transportation of rock along with Operator of said equipment. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |