Similar Projects
2021 Pipe Replacement Project
Bidding
Troy, PA

Pipe
Post-Bid
Rome, Wysox, PA 18837

Laurel Lake Road
Post-Bid
Columbia Cross Roads, PA 16914

Railroad Street Drainage Improvements Project
Results
Towanda, PA

Road Drainage Improvements
Results
New Albany, PA 18833

Besley Road
Post-Bid
Columbia Cross Roads, PA 16914

SR 3013 over Tb Towanda Ck
Results
$100,000 to $199,999 est. value
PA

Covered Bridge Road
Post-Bid
Towanda, PA 18848

SR 1049 Over Cold Brook
Results
$200,000 to $499,999 est. value
PA

Alparon Park Drainage Repair
Renovation
Post-Bid
Troy, PA 16947

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Repair of Embankment
Post-Bid
Towanda, PA 18848

Powell Rd to SR 706
Results
$100,000 to $199,999 est. value
PA

Fema/Pema Road Projects
Post-Bid
New Albany, PA 18833

SR3002 Soil Slide Temporary Fix
Results
$200,000 to $499,999 est. value
PA

Reported 05/13/2020 12:00 AM
Project Title

Roadway Bank Stabilization Project along Wickham Falls Road

Physical Address View project details and contacts
City, State (County) Towanda, PA 18848   (Bradford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be approximately 300 feet (+/-) in length, 12-16 ft. in height, 6-10 ft. in width, material will be Large Rock, STACKED to road grade. Stacked rock will be anchored with a "Core Trench". Additionally the replacement of a drainage culvert pipe will need to be done, this will be completed with an 18" Smooth Bore plastic, PENNDOT approved pipe, (supplied by the Township) after replacement of pipe, and ditch fill will be compacted "modified material" to eliminate settlement. Ditch work and NLT #3 rock will be placed at the "head wall" of the pipe. The roadway will need to be repaired, with 2RC/2B material, and graded to Township specifications upon completion. The project will include all equipment needed to place rock, transportation of rock along with Operator of said equipment.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents