Similar Projects
Shyft Group Manufacturing Expansion
Addition, Demolition, Renovation, Infrastructure
Conception
$16,000,000 CJ est. value
Charlotte, MI 48813

Reconstruct Taxiway Lighting Parallel Construction - City of Grand Ledge
Infrastructure
Conception
$1,045,000 CJ est. value
Grand Ledge, MI 48837

Hot Mix Asphalt Shared-use Path including Crush, Shape, Wide and Resurface, Culvert Replacements and pavement markings on Nixon Road
Infrastructure
Bidding
$1,219,000 CJ est. value
Grand Ledge, MI 48837

Hot Mix Asphalt Shared-use Path including Crush, Shape, Wide and Resurface, Culvert Replacements and pavement markings on Nixon Road
Infrastructure
Bidding
$1,219,000 CJ est. value
Grand Ledge, MI 48837

Eaton Rapids Public Schools Middle School Central and District-wide Parking Lots Renovations
Infrastructure, Renovation
Sub-Bidding
Eaton Rapids, MI 48827

Eaton Rapids Public Schools Middle School Central and District-wide Parking Lots Renovations
Infrastructure, Renovation
Sub-Bidding
Eaton Rapids, MI 48827

2022 Crush, Shape and HMA Overlay Project
Infrastructure
Post-Bid
$200,000 est. value
Potterville, MI 48876

HMA Resurfacing - Contract D
Infrastructure
Post-Bid
$2,000,000 est. value
Charlotte, MI

Hot Mix Asphalt Cold Milling and Resurfacing and Pavement Markings on M-43
Infrastructure
Results
$536,000 est. value
Grand Ledge, MI 48837

Overband Crack Fill
Infrastructure
Results
$923,290 CJ est. value
Charlotte, MI 48813

I-96 EB over Grand River and Billwood Highway Bridge Replacement
Demolition, New Construction, Infrastructure
Pending Verification
$21,331,000 CJ est. value
Dimondale, MI 48821

I-96 WB over Grand River and Billwood Highway Bridge Replacement
Demolition, New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Dimondale, MI 48821

Island Park - Bank Stabilization - City of Grand Ledge
Infrastructure
Conception
$250,000 CJ est. value
Grand Ledge, MI 48837

Vermontville Park Improvements
New Construction, Infrastructure
Bidding
$362,300 CJ est. value
Vermontville, MI 49096

Grand Ledge Delta Center Elementary
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Lansing, MI 48917

Last Updated 09/28/2023 01:07 PM
Project Title

Obstruction Marking/Lighting/Removal Runway 27 Construction - City of Grand Ledge

Physical Address View project details and contacts
City, State (County) Grand Ledge, MI 48837   (Eaton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $305,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of obstructions to the runway protection zone of runway 27 This project is included in the City of Grand Ledge fiscal year 2024-2028 Capital Improvement Plan. As of September 28, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents