Similar Projects
RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
College Park, GA 30337

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

T32-D7-Pavepres-SR 139 6-9-111011
Results
GA

Cora Robinson Park Improvements Project
Results
Fairburn, GA 30213

Commercial Row Commons
Renovation
Construction
Atlanta, GA 30309

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

Restoration Project for Chat GA Hwy 20 Trail Access
Renovation
Post-Bid
Sandy Springs, GA 30350

Peachtree Dunwoody at Telford Place Roadway Improvement Project
Results
Sandy Springs, GA 30328

Kiddie Academy Mid-Town / Atlanta
Renovation, Infrastructure - 9,413 SF
Pending Verification
$1,378,500 CJ est. value
Atlanta, GA 30308

Last Updated 08/11/2022 11:18 AM
Project Title

Splash Pad and Park Improvements

Physical Address View project details and contacts
City, State (County) Hapeville, GA 30354   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $931,290 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of construction of a new splash pad and park improvements, including sidewalk, curb & gutter, brick pavers, playground equipment, and related work. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. No proposal will be considered unless it is accompanied by satisfactory evidence that the Bidder holds either a Georgia State Contractor's License, Georgia State Utility Contractor's License, or qualifications with the Georgia Department of Transportation for similar work, in compliance with Act. O.C.G.A. 43 14 and 43-41. Failure to provide the bidder's license or qualification number on the outside of the sealed proposal will result in rejection of the bid. If the Contract is to be awarded, Owner will award the Contract on the basis of the base bid alone. All required federal, state, and local permits as well as required easements or rights of way for the project have not been obtained. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time of 90 calendar days. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment submitted once per month as provided in the General Conditions. Bidders must make positive efforts to use small and minority owned businesses. Bidders must comply with 41 CFR 60 4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60 4.Bidders must comply with the President's Executive Order No. ll246, as amended, prohibiting discrimination in employment regarding race, creed, color, sex or national origin; Title VI of the Civil Rights Acts of l964; the Davis Bacon Act; the Anti Kickback Act; and the Contract Work Hours Standards Act. Contractor shall pay Owner $_250.00_ for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $_300.00_ for each day that expires after such time until the Work is completed and ready for final payment

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents