Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Human Services Center Roof and HVAC Replacement
Results
Norcross, GA 30093

Phillips State Prison Chiller Replacement
Results
Buford, GA 30519

HAVC System Maintenance Services at Various County Facilities on an Annual Contract
Term Contract, Alteration
Post-Bid
Lawrenceville, GA

Pneumatic Control System Services
Term Contract, Alteration
Results
$56,070 est. value

Comprehensive HVAC Services - Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30045

HVAC Filters for Stock
Infrastructure
Results

Building Maintenance Air Purifiers
Alteration
Post-Bid
GA

Gwinnett County Corrections Cooler and Freezer Replacement Project
Alteration
Results
Lawrenceville, GA 30043

Harmony Elementary School HVAC and Classroom Renovations
Renovation, Alteration
Post-Bid
Buford, GA 30519

Milli-Q-Iq 7005 Purification System
Alteration
Results
Macon, GA

RTU 1 and 2 Replacement-Building 700
Alteration
Results
Lawrenceville, GA 30043

West Gwinnett Aquatic Center Duct Replacement
Alteration
Results
Berkeley Lake, GA 30096

Fire Logistics Building HVAC Replacement Project
Alteration
Results
Lawrenceville, GA 30046

Reported 05/06/2022 12:00 AM
Project Title

Mechanical Equipment Replacement - 2022

Physical Address View project details and contacts
City, State (County) Norcross, GA 30071   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Refurbish Cooling Tower - Includes replacing fill, nozzles, louvers, motor, bearings, belt, and epoxy coating pan. Also includes replacing cooling tower pumps. 2. Replace HVAC Hot Water Boiler - Replace existing HVAC boiler with 2 condensing boilers, including primary recirculating pumps. New system will be variable primary, variable secondary. The boilers have built in controllers, daisy-chained together, that handle all lead/lag and cascading functions. 3. Replace Heat Exchanger - Replace existing heat exchanger with similar. Includes replacing existing system pumps to WSHP loop. 4. Rebuild Energy Recovery Units - Replace components and controls for 3 energy recovery units. Includes upgraded control system, replacement of exhaust dampers and actuators, replacement of modulating face and bypass actuators. 5. Replace Water Source Heat Pumps - Replace 35 existing water source heat pumps. Includes replacement of condensate drain piping 6. Replace Split System Air Source Heat Pumps - Replace 10 existing air cooled heat pumps and associated air handling units with electric heat. Includes replacement of condensate drain piping.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents