Similar Projects
Snow Plowing and Hauling Equipment
Term Contract
Bidding
Springfield, MA

Plowing and Removal of Snow
Term Contract
Bidding
Peabody, MA

Hourly Snow Plowing Services
Term Contract
Post-Bid
Less than $500,000 est. value
Newton Center, MA 02459

Street Sweeping Services
Term Contract
Post-Bid
Brockton, MA

Snow Clearance, Removal and Salting/Sanding
Term Contract
Results
$220,000 est. value
Boston, MA

Highway Sweeping at Various Locations
Results
Less than $285,050 est. value

Snow and Ice Contractors for FY22 Snow and Ice Season
Term Contract
Bidding
Barnstable, MA

Roadway Snowplowing Services
Post-Bid
Lexington, MA 02420

Street Sweeping
Results
Westfield, MA

Annual Bid for Materials and Services
Term Contract, Infrastructure
Bidding
Ludlow, MA

Winter Liquid Road Treatment
Term Contract
Post-Bid
MA 01301

Structural Steel Cleaning, Painting and Related Work BR No N-20-027 Solomon Pond Road Over Interstate 290
Results
Less than $1,954,120 est. value
Northborough, MA 01532

Snow Plowing
Infrastructure
Bidding
Holyoke, MA

Snow Plowing Operations 2020-2021 Winter Season
Term Contract
Post-Bid
Stoughton, MA 02072

Street Sweeping and Hauling / DPWP and Parks
Term Contract
Results
$193,500 est. value
Worcester, MA

Reported 11/18/2021 12:00 AM
Project Title

Snow Plowing at the Housing Developments

Physical Address View project details and contacts
City, State (County) Middleboro, MA   (Plymouth County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Snow plowing proposals must be submitted on a per hour basis. 2. Snow plowing will consist of any/or all roadways, parking, walkways and/or any other designated areas as determined by the Authority; and at any/or all of the Authority’s projects. 3. Snow plowing will be on an "on-call" basis at the discretion of the Authority, and will commence upon notification of the Authority's maintenance personnel. 4. Back-up equipment must be available in the event of a break down. Back-up equipment information must be submitted on bid form. 5. Sand with ice melting compound must be applied to all driveways and parking areas upon icy conditions. Acceptable ice melting compounds are Ice Melt, Puremelt or equal. If salt, please state type and percentage 6 Damage to berms and landscape etc must be repaired by spring to satisfaction of MHA 7. Snow must be removed from all walkways including residents’ patios & walkways at the Riverview and Nemasket Developments 8. Plowing must be done when two (2) inches of snow. Plowing should be initiated by 7am in order to provide access for emergency vehicles 9. Telephone numbers must be provided so that notification may be given at any time for plowing. 10. Minimum equipment specifications are as follows: 4 Wheel Drive vehicle or an approved equal • 6' to 8' plow or an approved equal.

Details

Division 02 - Existing Conditions, Snow Control.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents