Similar Projects
2023 Renovations at Antioch Upper Grade School
Renovation
Post-Bid
$3,000,000 CJ est. value
Antioch, IL 60002

Lake County Tech Campus - 2023 Renovations
Renovation
Post-Bid
$250,000 CJ est. value
Grayslake, IL 60030

2022 Concrete Flatwork
Alteration
Results
Lake Zurich, IL

Balzer Park Poured In Place Playground Surface
Renovation, Infrastructure
Results
Lincolnshire, IL 60069

EHRM Infrastructure Upgrades Construction Project - Captain James A. Lovell VA Medical Center (VAMC) Located in Chicago
Renovation, Infrastructure
Post-Bid
$50,000,000 CJ est. value
North Chicago, IL 60064

Basketball and Tennis Court Surface Repair and Color Coating
Infrastructure
Results
$127,400 CJ est. value
Gurnee, IL 60031

2023 Unit Price Concrete Materials Purchase
Term Contract
Post-Bid
Highland Park, IL 60035

Fire Station #1 Concrete Pad Replacement
Renovation, Alteration
Results
$20,000 est. value
Libertyville, IL 60048

2023 Round Lake Beach Concrete Flatwork
Infrastructure
Post-Bid
Round Lake Beach, IL 60073

Systemwide Pavement Marking
Infrastructure
Results
$2,994,666 CJ est. value
Chicago, IL 60652

2023 Concrete Flatwork
Infrastructure
Post-Bid
Round Lake Beach, IL 60073

Concrete Replacement Station 20
Alteration
Results
$75,000 est. value
Deerfield, IL 60015

2023 Sidewalk Improvements Project
Infrastructure
Results
$243,701 CJ est. value
Buffalo Grove, IL 60089

Park City Flood Mitigation Storm Sewer Project
Infrastructure
Results
$2,061,658 CJ est. value
Park City, IL 60085

Roadway Reconstruction and Realignment; Building Removal and Site Clearing; Installation of a New Traffic Signal; Drainage Improvement; Aesthetic Landscaping to IL 83
Infrastructure
Results
$15,926,091 CJ est. value
Grayslake, IL 60030

Last Updated 09/28/2023 10:23 AM
Project Title

Smart Overlay and Ada Improvements, Accessible Pedestrian Signal Additions on IL 43 (Waukegan Rd)

Physical Address View project details and contacts
City, State (County) Deerfield, IL 60015   (Lake County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $3,787,665 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(3.35-Mile) SMART Overlay and ADA improvements, accessible pedestrian signal additions on IL 43 (Waukegan Rd), from South of IL 22 (Half Day Road) to Lake Cook Road, located in the Villages of Deerfield and Bannockburn in Lake County. Region : 1 District : 1 Federal Project # : N/A County(S) : Lake Key Route(S) : FAU 2706 Marked Route(S) : IL 43 Section(S) : FAU 2706 22 RS State Job #(S) : C-91-369-22 PPS #(S) : 1-80993-0000 70 Working Days Questions not accepted as of September 12, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM local time, September 01, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 018 - Smart Overlay and Ada Improvements, Accessible Pedestrian Signal Additions on IL 43 (Waukegan Rd)

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents