Similar Projects
Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Riverview - Chiller Condensing Unit Replacement and Air Handler Cleaning and Repair
Alteration
Bidding
Cincinnati, OH 45206

San Marco - Hot Water Heater Replacement
Alteration
Bidding
Cincinnati, OH 45206

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Mechanical Systems Service
Post-Bid
Beaver Creek, OH

Replace Fan Coil Units Building 7 Sinclair Community College
Results
$200,000 est. value
Dayton, OH

World-Wide Water Storage Tank Remediation
Term Contract
Results

Water Treatment Plant 300,000-Gallon Steel Ground Storage Tank Demolition, Contract 1-2022
Alteration
Bidding
$610,000 est. value
Hillsboro, OH

Clay Street Water Storage Tank Replacement
Post-Bid
South Zanesville, OH 43701

Z1DA--Replace Steam Heating Systems Phase II - 539-18-102
Results
$1,000,000 to $5,000,000 est. value
Cincinnati, OH 45220

Starr Elementary School Boiler Piping Replacement
Alteration
Bidding
$200,000 est. value
Oregon, OH

Beacon Schools Heating Boiler Replacement
Alteration
Post-Bid
$235,000 est. value
Athens, OH 45701

Tainter Gate Gearbox Repair
Results
Lewis Center, OH 43035

Boiler Replacement Project Mesopotamia Elementary School
Alteration
Bidding
$45,000 est. value
Mesopotamia, OH 44439

Last Updated 04/28/2022 03:30 PM
Project Title

Peden Boiler and Domestic Hot Water Tank Replacement 2022

Physical Address View project details and contacts
City, State (County) Athens, OH   (Athens County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Mechanical, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid $360,000.00 Alternate M-1 (add for duplex water softener) $10,000.00 Alternate M-2 (add for domesting hot water heater) $24,000.00 This is a rebid project with a reduced scope. New project scope is to replace two (2) existing hot water boilers in second floor mechanical room 201W with new conventional forced air combustion, non-condensing boiler units. Existing hot water system pumps will remain. Existing temperature controls will remain and will be expanded to include control of new boiler pumps BP-1 and BP-2. New electric actuators shall be provided for existing combustion air dampers and for existing hot water system bypass valve.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks, Heating Boilers.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents