Similar Projects
New Bedford Hurricane Barrier Dewatering
Design
$1,000,000 to $5,000,000 est. value
New Bedford, MA

Birch and Mcdowell Water and Drain Improvement
Infrastructure
Bidding
$234,000 est. value
Ayer, MA

Little Fresh Pond Shoreline Reconstruction
Infrastructure
Bidding
$150,000 est. value
Cambridge, MA 02138

Corrugated Polyethylene Pipe
Post-Bid
Leicester, MA

Maintenance of Existing Drainage Outfall
Post-Bid
Less than $15,000 est. value
Dedham, MA 02026

Replacement of Culvert No S-30-022 (Precast Concrete) and Related Work on A Section of Main Street (Route 20) Over Cedar Meadow Brook
Results
Less than $3,399,266 est. value
Sturbridge, MA 01566

Drilling IDIQ in Massachusetts and Rhode Island
Results

Drainage Vault Repairs
Post-Bid
Everett, MA 02149

Merriam Street Culvert Replacement-Cherry Brook
Results
Less than $360,000 est. value
Weston, MA 02493

Culvert Rehabilitation at Hudson Road and Walcott Street
Post-Bid
$175,000 est. value
Stow, MA 01775

Egmont Courtyards A, C and E Renovation
Results
$324,000 est. value
Brookline, MA 02446

Shot Crete Services for Seawall Projects
Post-Bid
Cohasset, MA 02025

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $2,022,520 est. value

Round Pond Retaining Wall Reconstruction
Post-Bid
Less than $550,000 est. value
Millbury, MA

Heritage Lane Drainage Repairs
Results
Less than $30,000 est. value
Holden, MA 01523

Last Updated 02/14/2022 04:24 AM
Project Title

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations

Physical Address View project details and contacts
City, State (County) (Bristol, Middlesex, Norfolk, Plymouth, Worcester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $517,550
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"0.500","a","Selective Clearing and Thinning","102." "5000.000","Lb","Temporary Steel Plates","107.04" "3.000","Ea","Deployment of Temporary Steel Plates","107.041" "750.000","Cy","Unclassified Excavation","120.1" "250.000","Cy","Muck Excavation","123." "5.000","Cy","Reinforced Concrete Excavation","127.1" "400.000","Ft","Pavement Milling for Berm","129.1" "30.000","Cy","Test Pit for Exploration","141.1" "80.000","Cy","Class B Trench Excavation","142." "20.000","Cy","Class B Rock Excavation","144." "4.000","Ea","Drainage Structure Removed","146." "200.000","Cy","Gravel Borrow - Type C","151.01" "10.000","Cy","Controlled Density Fill - Excavatable","153." "200.000","Ton","Crushed Stone","156." "500.000","Sy","Fine Grading and Compacting - Subgrade Area","170." "4.000","Ea","Catch Basin","201." "2.000","Ea","Manhole","202." "2.000","Ea","Gutter Inlet","204." "1.000","Ea","Leaching Basin","205." "2.000","Ea","Drop Inlet, Type Df","209.1" "10.000","Ea","Drainage Structure Adjusted","220." "80.000","Ft","Drainage Structure Rebuilt","220.2" "7.000","Ea","Frame and Cover","221." "5.000","Ea","Frame and Cover - Secured","221.1" "7.000","Ea","Frame and Grate - Massdot Bar Type","222." "7.000","Ea","Frame and Grate - Massdot Cascade Type","222.1" "150.000","Hr","Internal Pipe Inspection by Video Camera","226.9" "150.000","Hr","Removal of Drainage System Sediment","227.33" "25.000","Sf","Masonry Plug","227.4" "50.000","Ft","10 Inch Drainage Pipe - Option","234.10" "1000.000","Ft","12 Inch Drainage Pipe - Option","234.12" "100.000","Ft","18 Inch Drainage Pipe - Option","234.18" "100.000","Ft","24 Inch Drainage Pipe - Option","234.24" "50.000","Ft","36 Inch Drainage Pipe - Option","234.36" "2.000","Ea","12 Inch Drainage Pipe Flared End - Option","235.12" "2.000","Ea","18 Inch Drainage Pipe Flared End - Option","235.18" "50.000","Sy","Stone for Pipe Ends","258." "100.000","Ton","Dense Graded Crushed Stone for Shoulders","402.11" "100.000","Ton","Hma for Patching","451." "50.000","Gal","Asphalt Emulsion for Tack Coat","452." "500.000","Ft","Hma Joint Sealant","453." "50.000","Ton","Temporary Asphalt Patching","472." "50.000","Ft","Granite Curb Type Vb - Straight","506." "50.000","Ft","Granite Edging Type Sb - Straight","511.1" "3.000","Ea","Granite Curb Inlet - Straight","514." "250.000","Ft","Hot Mix Asphalt Curb - Option","570." "100.000","Ft","Curb Removed and Reset","580." "4.000","Ea","Curb Inlet Removed and Reset","581." "200.000","Ft","Highway Guard Removed and Reset","630." "20.000","Ea","Individual Post Removed and Reset","632.2" "100.000","Ft","Fence Removed and Reset","670." "20.000","Ea","Silt Sack","697.1" "750.000","Sy","Geotextile Fabric for Stabilization","698.1" "25.000","Ton","Hot Mix Asphalt Sidewalk or Driveway","702." "4.000","Ea","Emergency Response","748.1" "250.000","Cy","Loam Borrow","751." "25.000","Cy","Topsoil Rehandled and Spread","752." "1000.000","Sy","Seeding","765." "750.000","Ft","Sediment Control Barrier","767.121" "50.000","Day","Traffic Cones for Traffic Management","851.1" "320.000","Sf","Safety Signing for Traffic Management","852." "25.000","Day","Truck Mounted Attenuator","853.403" "50.000","Day","Arrow Board","856." "25.000","Day","Portable Changeable Message Sign","856.12" "1000.000","Day","Reflectorized Drum","859." "10.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "5.000","Cy","4000 Psi, 3/8 Inch, 660 Cement Concrete","905." "100.000","Lb","Steel Reinforcement for Structures - Epoxy Coated","910.1" "200.000","Ton","Riprap","983.1" "50.000","Cy","Riprap Removed and Relaid","983.3" "4.000","Day","Control of Water - Various Locations","991."

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents