Similar Projects
Electric Power Cable for PSB and Former County Nursing Home
Alteration
Bidding
Auburn, NY 13021

Electrical Services for the WRRF and City of Plattsburgh
Term Contract
Bidding
Plattsburgh, NY

2019 Pole Replacement
Post-Bid
Green Island, NY 12183

2019 Hudson Avenue Switch Repair
Post-Bid
Green Island, NY 12183

Provide Generator Radiator Shroud - Green Haven CF
Results
$100,000 to $250,000 est. value
Stormville, NY 12582

2020 Generator Maintenance and Service
Term Contract
Results
Poughkeepsie, NY 12601

Terry MT Generator Installation
Alteration
Bidding
Schuyler Falls, NY 12985

Mural and Accent LED Lighting
Post-Bid
Albany, NY 12207

Alfred Peet and Braddon Halls Full Building Backup Power and Asbestos Abatement
Results
Alfred, NY 14802

Maintenance of an Onsite Diesel 500 KW Generator at CWC Headquarters
Alteration
Bidding
Arkville, NY

Electric Utility Service
Post-Bid
Dover Plains, NY 12522

2020-2025 Residential Generator Maintenance and Repair Service
Term Contract
Results

New York State Police Station Building Electrical
New Construction, Alteration - 4,842 SF
Bidding
$500,000 to $1,000,000 est. value
Dunkirk, NY 14048

Purchase Mobile Generator
Post-Bid
Albany, NY 12207

Emergency Generators Maintenance and Repairs
Term Contract
Results
Albany, NY 12207

Reported 05/29/2021 12:00 AM
Project Title

Maple Avenue Substation 115Kv Switchgear Replacement

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14850   (Tompkins County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Completion Expected October 2021
Bids Due View project details and contacts
Estimated Value $300,000 to $350,000
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

1. Modify/upgrade two (2) existing 115kV S&C circuit switchers and replace three (3) existing “B” line protection relays. 2. Disconnect, remove, and dispose two (2) 115kV circuit switchers and install two (2) Owner provided 115kV circuit switchers on the existing concrete caisson foundations. 3. Supply and install three (3) new SEL-421 relays and reinstate existing relay IO and communication wiring on the new relays. 4. Test new SEL-421 relays for all three 115kV circuit switchers, complete electrical and operational testing of the new circuit switchers, and download the setting files to all new relays. 5. Complete interconnection wiring connections between the new A10H and A20H circuit switchers and the existing PRP1 & 2 cabinets and terminate all control wiring coming into the control panels. 6. Final testing/commissioning to place into service all new equipment installed under this contract.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents