Similar Projects
Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Moenave Trail Improvements
Results

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

300 West Reconstruction from 900 South to 2100 South
Results

Moab Regional Hospital Bid Package 1
New Construction, Alteration
Post-Bid
Moab, UT 84532

Reclamation Construction for Mineral Canyon Project
Results
UT

Contractor - La Sal Mountain Loop Road
Infrastructure
Post-Bid
$20,000,000 to $30,000,000 est. value
Moab, UT 84532

Dirt Road Dust Treatment
Results
Moab, UT

S Roadway Improvements
Results

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

US-191 - SR-279 to Seven Mile Wash
Infrastructure
Results
$6,000,000 to $10,000,000 est. value
Moab, UT 84532

Sand Flats Gravel Parking Lot
Infrastructure
Results
Moab, UT 84532

Last Updated 07/22/2022 04:06 PM
Project Title

Asphalt Paving - Arches National Park

Physical Address View project details and contacts
City, State (County) Moab, UT 84532   (Grand County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Install of hot mix asphalt paving in the Windows loop. See the statement of work and attachments for all requirements. Delivery: 10/20/2022 Delivery Location Code: 0009060456 NPS, Arches NP 2282 S. West Resource Blvd. Moab UT 84532 US Period of Performance: 10/03/2022 to 10/20/2022 Magnitude:Between $100,000 and $250,000 All questions should be emailed directly to the Contracting Specialist. Only written RFI's will be considered and responded to by the Government. NPS responses to RFIs will be posted as an amendment to the solicitation

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents