Similar Projects
Autocamp Zion
New Construction - 8,441 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Virgin, UT 84779

DFCM Construction - Pre-Qualified - DNR-Parks and Recreation Quail Creek Campground Improvements
Renovation
Bidding
$2,500,000 est. value
Hurricane, UT 84737

DSU - Athletic Surface Rebrand - Gymnasium Flooring
Renovation
Bidding
Saint George, UT

Sand Hollow RV Resort
New Construction
Post-Bid
Hurricane, UT 84737

Mill Creek High School Pickleball Courts Project
New Construction
Post-Bid
Saint George, UT 84790

Thunder Junction Park Pavilion and Seating Area
Renovation
Results
Saint George, UT 84770

Bloomington Park Pickleball Courts
Results
Saint George, UT 84790

Reach Higher Performance Center
New Construction - 28,783 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84770

RV Park
New Construction
Pending Verification
Hurricane, UT 84737

Little Valley Pickleball Court Resurfacing Phase 2
New Construction
Post-Bid
Saint George, UT 84790

DFCM General and Site/Civil-Gunlock Park Campground Improvements
Renovation
Results
$1,968,000 est. value
Gunlock, UT 84733

Hurricane Equestrian Park Phase I
Renovation
Post-Bid
Hurricane, UT

Fish Rock Park
New Construction
Results
Saint George, UT 84770

Oak Valley Rcmp Eating Shelters
New Construction
Post-Bid
Virgin, UT 84779

Temple Springs Park Phase 1
Infrastructure
Results
Saint George, UT 84770

Reported 03/17/2022 12:00 AM
Project Title

Z--Zion - Rehabilitate South Campground - Gaoa

Physical Address View project details and contacts
City, State (County) Springdale, UT   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation South Campground – the work will include the rehabilitation of approximately 127 campsites, reorganizing them in loops to simplify visitor wayfinding. Vehicle pads will be repaved; use areas resurfaced and delineated, existing comfort stations demolished, and site furnishings replaced which will improve visitor experience in this critical campground. The 1.7 mile road system will be partially reconfigured and repaved, impacted areas restored and an open ditch system converted to piped irrigation for visitor safety. A cast in place concrete drainage channel will be constructed to carry storm water approximately 2,200 lineal ft. across the site. The channel will be approximately 5’ wide, will have a steel “traction tread” (or approved equivalent) top, and will vary in depth. The project will also rehabilitate two associated facilities, the historic South Campground comfort station and Watchman Campground amphitheater. For the historic comfort station, this facility will receive replaced utilities, fixtures, and interior finish materials, while preserving the character of the structure. Pathways will be installed to enhance visitor experience and improve accessibility. This building will be rehabilitated with one employee restroom and associated storage. The rehabilitation of the Watchman Campground Amphitheater will facilitate compliance with accessibility standards. Accessible seating and stage areas will be installed. Pavement and storm drain will be replaced to reduce hazards and provide accessibility. Rehabilitate South Campground Capital Improvements: This project includes the construction of three new comfort station restroom buildings based on a prototype used throughout the park, installation of a 15-site picnic area, and construction of a new fee station to replace the existing portable fee station. All of these components are integral to the function of the campground and necessary to provide an appropriate visitor service within it. Construct Wilderness Permit Office in South Campground Fee Station: This project will include the construction of the Backcountry Wilderness Permit portion of a dual Fee Station/Permitting Office in the South Campground. It will be completed in coordination with the two projects denoted above. The wilderness permitting office will provide a location for visitors requiring permits (including backcountry, climbing, Angel’s Landing, etc.) to come and quickly pick them up without needing to park at the Visitor Center. The building will be a 1,460 SF building that will include both indoor and outdoor registration space, offices for various wilderness and permitting employees, storage, a restroom, and administration.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents