Similar Projects
Reported | 03/17/2022 12:00 AM |
Project Title | Z--Zion - Rehabilitate South Campground - Gaoa |
Physical Address | View project details and contacts |
City, State (County) | Springdale, UT (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | Greater than $10,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rehabilitation South Campground – the work will include the rehabilitation of approximately 127 campsites, reorganizing them in loops to simplify visitor wayfinding. Vehicle pads will be repaved; use areas resurfaced and delineated, existing comfort stations demolished, and site furnishings replaced which will improve visitor experience in this critical campground. The 1.7 mile road system will be partially reconfigured and repaved, impacted areas restored and an open ditch system converted to piped irrigation for visitor safety. A cast in place concrete drainage channel will be constructed to carry storm water approximately 2,200 lineal ft. across the site. The channel will be approximately 5’ wide, will have a steel “traction tread” (or approved equivalent) top, and will vary in depth. The project will also rehabilitate two associated facilities, the historic South Campground comfort station and Watchman Campground amphitheater. For the historic comfort station, this facility will receive replaced utilities, fixtures, and interior finish materials, while preserving the character of the structure. Pathways will be installed to enhance visitor experience and improve accessibility. This building will be rehabilitated with one employee restroom and associated storage. The rehabilitation of the Watchman Campground Amphitheater will facilitate compliance with accessibility standards. Accessible seating and stage areas will be installed. Pavement and storm drain will be replaced to reduce hazards and provide accessibility. Rehabilitate South Campground Capital Improvements: This project includes the construction of three new comfort station restroom buildings based on a prototype used throughout the park, installation of a 15-site picnic area, and construction of a new fee station to replace the existing portable fee station. All of these components are integral to the function of the campground and necessary to provide an appropriate visitor service within it. Construct Wilderness Permit Office in South Campground Fee Station: This project will include the construction of the Backcountry Wilderness Permit portion of a dual Fee Station/Permitting Office in the South Campground. It will be completed in coordination with the two projects denoted above. The wilderness permitting office will provide a location for visitors requiring permits (including backcountry, climbing, Angel’s Landing, etc.) to come and quickly pick them up without needing to park at the Visitor Center. The building will be a 1,460 SF building that will include both indoor and outdoor registration space, offices for various wilderness and permitting employees, storage, a restroom, and administration. |
||||||||
Details | Park/Playground, Renovation.
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |