Similar Projects
Air Cooled Chiller for FMC Carswell
Term Contract
Bidding
Fort Worth, TX 76127

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Equipment Installation Service and Related Products - Supplemental
Post-Bid
Abilene, TX

Steam Heating Replacement for Quads
Results
$1,142,200 est. value
Abilene, TX 79604

Installation of 12 HVAC (Heating /Cooling) Systems
Results
Merkel, TX 79536

Emergency Generator Replacement, Heat Sensors, HVAC Replacement
Post-Bid
$3,601,783 est. value
Abilene, TX 79602

TDCJ Robertson Unit 30-Ton RTU W/Install
Results
$99,034 est. value
Abilene, TX 79601

Exhaust Hood & Duct Cleaning - 2 Month Service
Post-Bid
San Antonio, TX 78275

TDCJ Robertson Single-Zone Heating Unit
Results
Abilene, TX 79601

San Jacinto and Taylor Developments Air-Conditioning Unit Installation 2021
Alteration
Post-Bid

Building Automation System (BAS) Replacement - North Texas Region
Results
$1,791,763 est. value
Abilene, Mexia, Pollok, Rusk, Wichita Falls, TX 75969

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Equipment-Statewide
Results
Less than $44,107 est. value

J045--New - Kd Chiller Inspections
Term Contract
Post-Bid
Kerrville, TX 78028

TDCJ Robertson Three (3) Single Zone AHU's
Results
$311,468 est. value
Abilene, TX

Last Updated 09/23/2021 04:48 PM
Project Title

HVAC Abilene - 2 Carrier Units

Physical Address View project details and contacts
City, State (County) Abilene, TX   (Taylor County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $155,930
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor, materials, tools, equipment, and supervision to complete the following: Replace Two (2) Roof Top Units - 3 and 4 1. Lockout and tag-out RTU's 3 and 4 2. Provide crane service to disconnect and remove existing units 3. Provide and install two (2) new Carrier 60 Ton RTU's 4. Set new units with crane 5. Reconnect using existing electrical and control wiring 6. Install new units connecting to existing duct and drain lines 7. Apply power, start up, and verify operation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents