Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Sage Valley Apartments Phase 2
New Construction
Conception
West Valley City, UT

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

South Cairns Development
New Construction
Design
Sandy, UT 84070

Tradition Point Apartments
New Construction
Bidding
Murray, UT 84107

The Road Home - Palmer Court Renovation
Renovation
Bidding
Salt Lake City, UT 84111

Alta Depot
New Construction - 434,303 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84102

Alta Depot
New Construction - 434,303 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84102

U-Hospital - Helipad Parking Garage Repair
Results
$254,746 est. value
Salt Lake City, UT 84113

DFCM Construction- UU Auxiliary Svcs West Village Family/Graduate Housing-22011750-VBS DB Stg II
New Construction - 442,000 SF
Results
$109,525,000 est. value
Salt Lake City, UT 84108

The Residences at Sugar Alley
New Construction - 240,148 SF
Construction
$12,027,302 est. value
Salt Lake City, UT 84106

The Revival
New Construction - 223,852 SF
Construction
$7,500,000 est. value
Salt Lake City, UT

800 South & State
New Construction
Pending Verification
Salt Lake City, UT

West End
New Construction
Pending Verification
Salt Lake City, UT

Mixed Use Project
New Construction
Conception
Salt Lake City, UT 84102

Last Updated 01/20/2022 01:55 PM
Project Title

Sage Valley Apartments

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84044   (Salt Lake County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage
Contracting Method
Project Status Construction Commenced June 2020, Construction Completion Expected April 2023
Bids Due View project details and contacts
Estimated Value $47,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Building 1 - Parking Garage - one story East Building - Apartments - five stories above parking structure West Building - Apartments - five stories above parking structure Gatehouse - Apartments - one story

Details

704,593 SF - 2 Apartments/Condominiums, 5 Stories Above Grade, 253,210 SF New Construction 430, 1 Apartments/Condominiums, 1 Story Above Grade, 31,655 SF New Construction, Parking Garage, 1 Story Above Grade, 166,518 SF New Construction, 770 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents