Similar Projects
Ariel Canal Water Quality Improvement
Infrastructure
Bidding
$1,800,000 est. value
Daytona Beach, FL 32116

Ariel Canal Water Quality Improvement
Infrastructure
Bidding
$1,800,000 est. value
Daytona Beach, FL 32116

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Ponce De Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement, Volusia County, Florida
Results
$5,000,000 to $10,000,000 est. value
FL

Design/Build H Matthew Waterfront Repair, STA Ponce De Leon Inlet, USCG Station New Smyrna Beach, FL
Results
$1,000,000 to $2,000,000 est. value
New Smyrna Beach, FL

Orange City Oncology Medical Office - Sitework
New Construction
Construction
Orange City, FL

Miller's Ale House - Sitework
New Construction
Construction
$508,000 est. value
Daytona Beach, FL 32116

Emergency Directional Bore
Term Contract
Post-Bid
New Smyrna Beach, FL

Flomich Street and Riverside Drive Storm Outfall Replacement
Results
Less than $150,000 est. value
Holly Hill, FL 32117

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Drainage Repair
Results
Less than $1,300,000 est. value
FL

Drainage Repair
Results
Less than $300,000 est. value
FL

49 Lantana Drive Drainage Improvements
Results
DeBary, FL

Site Work, Infrastructure, and Improvements to the Marine Science Center Bird Office Modular Building
Results
Less than $140,032 est. value
Ponce Inlet, FL 32127

Last Updated 01/19/2022 08:06 AM
Project Title

Canal C-05 Diversion Structure and Offsite Pond Improvements

Physical Address View project details and contacts
City, State (County) New Smyrna Beach, FL 32168   (Volusia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Canal C-05 Diversion Structure and Offsite Pond Improvements, which includes installation of several stormwater control structures, stabilizing the canal embankment and approximately 43’ of 36” RCP pipe, and miscellaneous site work. the construction a diversion structure in the C-05 Canal to route flow to the adjacent borrow pit to provide water quality treatment. The diversion structure will consist of a sheet pile wall with a concrete cap. The project scope also includes the installation of drainage pipe and structures, earthwork and other associated improvements

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents