Similar Projects
Last Updated | 01/12/2023 03:09 PM |
Project Title | 2021 CDBG Water System Improvements Project Master Meter (4 Inch) Dixon Springs at Red Cedar Lane |
Physical Address | View project details and contacts |
City, State (County) | Sevierville, TN 37876 (Sevier County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $67,200 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All bidders must be licensed General Contractors as required by the Contractors Licensing Act of 1994 of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. 2021 CDBG Water System Improvements - Master Meter (4 inch) - Dixon Springs at Red Cedar Lane, Blow-off valve assemblies - Dixon Springs for the Sevier County Water Department Every request for such interpretation should be in writing addressed to Robert G. Campbell, P.E. rcampbell@rgc-a.com |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |