Similar Projects
Pinnacle Express Service Center
New Construction - 10,800 SF
Conception
$10,000,000 CJ est. value
Minot, ND 58701

Burning Hearts Church Townhomes
New Construction - 21,122 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Fargo, ND 58078

Sierra Townhomes
New Construction - 187,018 SF
Design
$10,000,000 CJ est. value
West Fargo, ND 58078

2022 Round 1 Structure Demolition and Site Restoration
Demolition, Infrastructure
Bidding
$50,000 est. value
Minot, ND

Brunelle Home Raise
Demolition, Infrastructure
Bidding
$200,000 est. value
Burlington, ND

Mechanical, Fire Sprinkler, Electrical at United Way Center for Opportunity
Renovation
Post-Bid
Bismarck, ND 58501

2021 Exploratory Drilling AML
Term Contract
Post-Bid
$200,000 est. value

2021 Buechler/Velva Phase II AML
Results
$400,000 est. value
ND

Yard Waste Drop Site Improvements
Results
$357,145 est. value
Grand Forks, ND

Boulevard Square III - Phase 1
New Construction - 11,048 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fargo, West Fargo, ND 58103

2021 Beulah/Zap Phase 16 AML
Post-Bid
Beulah, ND

507 Railroad Avenue Site Restoration
Results
$539,000 est. value
Ray, ND 58849

Bismarck Public Health Facility - Sitework
New Construction - 21,825 SF
Design
Bismarck, ND 58504

Structure Demolition and Site Restoration
Demolition
Post-Bid
Minot, ND

Airport Improvements
Renovation
Results
Ashley, ND

Last Updated 04/13/2022 10:20 AM
Project Title

General Aviation Terminal Site Work

Physical Address View project details and contacts
City, State (County) Killdeer, ND   (Dunn County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove Concrete 95 SY Bituminous Pavement 650 TONS Remove Bituminous Pavement 200 SY Water Service Line 160 LF Remove Existing Terminal Building 1 LS Sanitary Sewer Septic System 1 LS Common Excavation 850 CY Silt Fence 650 LF Aggregate Base CL 5 550 CY Pavement Marking 400 LF 4” Concrete Walk 320 SY Seeding 1.00 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents