Similar Projects
Heritage Lift Station - City of Gillette
Infrastructure
Conception
$4,500,000 CJ est. value
Gillette, WY 82716

Foothills Boulevard Curves/Drainage - 47401 - City of Gillette
Infrastructure
Conception
$2,500,000 CJ est. value
Gillette, WY 82716

Gillette to Wright Wy 59
Infrastructure
Design
$6,139,000 CJ est. value
Gillette, WY 82718

Gillette to Wright Wy 59
Infrastructure
Design
$6,139,000 CJ est. value
Gillette, WY 82718

Road Maintenance
Infrastructure
Post-Bid
Gillette, WY

Annual Trenching and Boring Services
Term Contract
Post-Bid
Gillette, WY

District 4 Logo Signs
Infrastructure
Results
$200,000 est. value
Gillette, WY

Gurley Avenue Overpass - 2022 Deck Injection Repairs
Renovation, Infrastructure
Results
$480,000 est. value
Gillette, WY 82716

Maverik Gas Station / Gillette
New Construction, Infrastructure - 5,982 SF
Construction
$4,500,000 CJ est. value
Gillette, WY 82716

Maverik Gas Station / Gillette
New Construction, Infrastructure - 5,982 SF
Construction
$4,500,000 CJ est. value
Gillette, WY 82716

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

Powder River Basin Renewable Natural Gas Facility
New Construction, Infrastructure
Pending Verification
$7,500,000 CJ est. value
Gillette, WY 82716

Warlow Drive Street Improvements Project - 44331 - City of Gillette
Infrastructure
Conception
$2,250,000 CJ est. value
Gillette, WY 82716

Campbell County Roads - Dust Suppression Project
Infrastructure
Post-Bid
WY

Kluver Road PRV Project
Infrastructure
Results
$300,000 est. value
Gillette, WY 82716

Last Updated 12/25/2023 10:34 PM
Project Title

Prairie Eagle Bishop Road Relocation

Physical Address View project details and contacts
City, State (County) Gillette, WY 82718   (Campbell County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Relocation of 3.5 miles of Bishop Road, starting at the intersection with Hwy. 59. All bids rejected Project has been Rebid

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents