Similar Projects
Upper Brunet Dam Rehabilitation
Renovation
Design
$600,000 est. value
Loretta, WI

Dam #2 Rehabilitation
Renovation
Bidding
$25,000 est. value
Neillsville, WI

Miller Dam Sluice Gate Replacement
Post-Bid
$135,000 est. value
Medford, WI

Twin Parks 7 Dam Repairs
Renovation
Post-Bid
WI

Twin Parks 6 Dam Riser Repair
Results
Dodgeville, WI 53533

Trout Lake Dam Repair
Results
$290,000 est. value
Lyndon Station, WI 53944

Lock and Dam 4 Lower Guide Wall End Cell Project
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Alma, WI

Chetek Dam Repairs
Results
Less than $30,000 est. value
Chetek, WI

2022 Lake Leota Dam Repairs
Renovation
Post-Bid
Evansville, WI 53536

Jordan Park Dam Repair
Results
Stevens Point, WI 54481

Land Services
Renovation
Post-Bid
$308,000 est. value
Siren, WI

Shea Dam Restoration
Renovation
Results
Mercer, WI

Local Roads Improvement Project
New Construction, Infrastructure
Post-Bid
$600,000 est. value
Montreal, WI 54550

2021 Belleville Dam Repair
Renovation
Results
Belleville, WI

Dam 12 Removal
Infrastructure
Results
$30,000 est. value
Neillsville, WI

Reported 05/26/2022 12:00 AM
Project Title

Steam Tunnel Repairs

Physical Address View project details and contacts
City, State (County) Oshkosh, WI 54901   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: Remove and replace approximately 130' of concrete steam tunnel lid and new manhole access cover and install new insulated and waterproof concrete lid in same location. In addition, install new protective and removable steel pipe bollards to minimize damage from heavy vehicle traffic over tunnel. Project also includes new steel steam pipe supports brackets secured to existing tunnel walls.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents