Similar Projects
Expansion Fire Medical Station Number 6 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66044

Stadium Improvements - North End Zone and West Side - University of Kansas
Renovation
Conception
$170,000,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

City of Lawrence Field Operations Campus
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Lawrence, KS 66044

Valvoline Instant Oil Change / Lawrence
Demolition, New Construction, Infrastructure - 2,025 SF
Post-Bid
$1,100,000 CJ est. value
Lawrence, KS 66046

Valvoline Instant Oil Change / Lawrence
Demolition, New Construction, Infrastructure - 2,025 SF
Post-Bid
$1,100,000 CJ est. value
Lawrence, KS 66046

Milling, Patch, Overlay, and Concrete Maintenance Program (Phase 1)
Infrastructure
Results
$5,000,000 est. value
Lawrence, KS 66044

2021 Alley Rehabilitation
Infrastructure
Results
$60,000 est. value
Lawrence, KS

Berry Global Addition
Addition, Demolition, Infrastructure
Construction
$1,500,000 CJ est. value
Lawrence, KS 66049

Schlumberger / Lawrence
Addition, New Construction, Infrastructure - 1,300 SF
Construction
$700,000 CJ est. value
Lawrence, KS 66049

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

Renovation of Allen Fieldhouse - University of Kansas
Renovation
Conception
$20,000,000 CJ est. value
Lawrence, KS 66045

University of Kansas Stadium Improvements
Renovation
Design
$335,000,000 CJ est. value
Lawrence, KS 66044

Milling, Patch, Overlay, and Concrete Maintenance Program - Phase 2
Infrastructure
Post-Bid
$1,000,000 est. value
Lawrence, KS

Last Updated 10/04/2023 11:21 AM
Project Title

Memorial Stadium Renovations Phase 1 - 050-11338 - University of Kansas

Physical Address View project details and contacts
City, State (County) Lawrence, KS 66045   (Douglas County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $220,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.bizjournals.com/kansascity/news/2023/08/08/turner-construction-leads-kansas-football-stadium.html Turner Construction Co. posted one of the first big victories of the new college football season, winning the contract to lead work on a major renovation of the University of Kansas’ stadium. ---------------------------------------------------------------------------------------- https://www.heraldbulletin.com/sports/national_sports/kansas-announces-sweeping-renovations-to-memorial-stadium-and-football-complex/article_3f76d419-8483-5a36-bb1d-ad465206d944.html The first phase will include additional renovations to the Anderson Family Football Complex, which just weeks ago unveiled new locker rooms and training spaces, and construction on the southwest, west and north sides of the football stadium that includes a new conference center. The work will begin after the upcoming season and be completed by the start of the 2025 season. ---------------------------------------------------------------------------------------- Kansas Memorial Stadium is dedicated to KU students who fought in World War I and is the first such structure built on a college campus west of the Mississippi River. Various stages of construction were completed in 1925, 1927 with expansion in 1963 and the original press box completed in 1967. Restoration of portions of the stadium was completed in 1978 and a restoration/expansion integrating a new structure on the west side was completed in 1998. The Kansas Athletics Incorporated (KAI) proposed project improves sightlines to the playing field, enhances concessions, restrooms, plazas and ticketing areas, concourses and vertical circulation. Improvements will also include work focused on the west sideline and south end zone with the intent to avoid visual obstructions of Campanile Hill. The stadium will be integrated with the Anderson Family Football Complex and the overall exterior and interior quality of the original stadium facility will be improved. The project funding proposed may include private gift, Kansas Athletics Inc. and/or funds to be determined. This project is in the state’s FY 2023-2027 Capital Improvement Program. As of June 6, 2022, further details regarding design and construction have not been identified. This project is pending funding. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents