Project Title | FY22 Fiber Expansion |
Physical Address | View project details and contacts |
City, State (County) | Auburn, AL (Lee County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | No Responses Submitted |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project includes the construction of 48F trunk line and 6F fiber drops to five intersections within the City of Auburn. The project will involve installation of conduit, fiber optic cable, splice closures, fiber switches, and fusion splices in accordance with City of Auburn standard specifications and the plan documents. The work will be confined to the right of way shown on the construction drawings. Work will be conducted in high vehicular traffic areas and pedestrian traffic areas; therefore, all necessary safety precautions should be taken. Care should be exercised in all locations to work around existing utility lines and services. The existing traffic signals shall remain in operation for the duration of construction. It will be the responsibility of the contractor to ensure no damage is done to existing utility services or sidewalk. Except as otherwise noted on the drawings, concrete removed or damaged during the course of this project shall be replaced in complete sections to match existing. Small patches of concrete will not be accepted. Any damage caused shall be repaired at the sole expense of the contractor at no cost to the City of Auburn. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |