Similar Projects
Tapping Sleeves and Valves for Ductile and Cast-Iron Pipe
Term Contract
Bidding
GA

Steel Pipes, Valves and Fittings
Post-Bid
Atlanta, GA 30303

Utilities Location Services
Infrastructure
Post-Bid
Atlanta, GA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Agriculture Meter Installation Project
Results
Less than $285,785 est. value
Hapeville, GA 30354

Contract For Replacement Of 2-Inch And 4-Inch Water Mains
Alteration
Post-Bid
East Point, GA

Replacement and Installation of Fire Hydrants Standby-Miscellaneous Construction
Results
Less than $100,000 est. value
GA 30303

Water Meter Boxes and Valves Boxes
Term Contract
Post-Bid
GA

Citywide Water Service Replacement and Resurfacing
Results
Union City, GA

Water Meter Testing and Repairs
Term Contract
Results
Less than $126,000 est. value
GA

Small Water Meter Installation
Term Contract
Results
GA

Large Water Meter Installation
Results
GA

Water Meters
Term Contract
Results
$750,000 est. value
Atlanta, GA 30303

Fayetteville Road Water Main Improvement
Results
Less than $672,600 est. value
Fairburn, GA

Reindeer Drive Water Main Replacement
Term Contract
Results
Atlanta, GA 30329

Last Updated 02/18/2022 11:08 AM
Project Title

Cedar Avenue Water Main Infrastructure CDBG Project

Physical Address View project details and contacts
City, State (County) East Point, GA 30344   (Fulton County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work under this Contract shall include, but not necessarily be limited to, installation of new 6-inch and 8-inch diameter water mains via open-cut trenching methods, the abandonment of the existing 2-inch and 4-inch water mains, replacement of water services, installation of fire hydrants and valves, water main flushing, disinfection and bacteriological testing, roadway pavement removal and replacement of pavement and pavement markings, temporary traffic control, providing continuous access to all driveways and buildings within the Project area, clean up, and all other miscellaneous work necessary to complete the Project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents