Similar Projects
Apple Valley Subdivision
New Construction
Conception
Rapid City, SD 57703

Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Red Rock Shadows Townhomes and Apartments
New Construction
Design
$14,000,000 est. value
Rapid City, SD

Block 5 Project
New Construction, Infrastructure - 5,000 SF
Design
$60,000,000 CJ est. value
Rapid City, SD 57701

E. Anamosa Street - Street and Storm Sewer Repairs
Infrastructure
Post-Bid
$1,047,175 CJ est. value
Rapid City, SD 57703

Industrial Park Development & Industrial Park Lift Station
New Construction, Infrastructure
Post-Bid
Wall, SD

Runway 12-30 Reconstruct, Extend and Widen
Infrastructure
Results
$5,712,442 CJ est. value
Wall, SD 57790

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Sunset Ranch Subdivision
New Construction
Pending Verification
Rapid City, SD 57703

McMahon Subdivision Apartment Complex
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Rapid City, SD 57701

Grading, Interchange Reconstruction, PCC Surfacing
Infrastructure
Conception
$33,216,000 CJ est. value
New Underwood, SD 57761

Full Depth Reclamation, AC Surfacing, Mill, AC Resurfacing, Pipe Work
Infrastructure
Design
$8,494,000 CJ est. value
East Central Pennington, SD 57725

Liberty Plaza Subdivision Phase II Street & Utility Plan
Alteration
Post-Bid
Box Elder, SD

Skyline Pines East Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Rapid City, SD 57701

Last Updated 09/06/2022 03:34 PM
Project Title

Rushmore Center

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57701   (Pennington County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Located at Eglin St and west of Luna Ave. Further scope details have not been released. As of September 6, 2022, this project received a recommendation of approval for rezoning by the Zoning Board of Adjustment and City of Rapid City Planning Commission on August 25, 2022. It will go before the City Council for the first reading on September 6, 2022. The second reading will be on September 19, 2022. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents