Similar Projects
Dry- Dock and Overhaul Services for the M/V Governor
Post-Bid
Falmouth, MA

Two Float Replacements
Post-Bid
Bourne, MA 02532

Dry-Dock and Overhaul Services for the M/V Eagle
Results
$1,917,691 est. value
Falmouth, MA

Oak Bluffs Structural Pier Repairs 2020 - Phase II
Results
$752,524 est. value
Falmouth, MA

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Oak Bluffs and Vineyard Haven Pile Wrap Project
Infrastructure
Post-Bid
$1,342,266 est. value
Falmouth, MA

Dry-Dock and Overhaul Services for the M/V Woods Hole
Results
$761,882 est. value
Falmouth, MA

Drydock and Overhaul Services for the M/V Iyanough
Infrastructure
Post-Bid
Falmouth, MA

Sesuit Harbor Floating Docks
Results
Dennis, MA 02660

Pier Upgrades for New Training Vessel
Infrastructure
Post-Bid
$16,500,000 est. value
Bourne, MA 02532

Remove and Replace Three Treated Timber Piles at Bass River Boat Ramp
Results
$24,939 est. value
Yarmouth, MA 02664

Fishing and Boating Access
Results
$24,939 est. value
Yarmouth, MA

Drydock and Overhaul Services for the M/V Gayhead
Results
$1,131,455 est. value
Falmouth, MA

Fendering Replacement at Woods Hole Laboratory, Nefsc
Results
Falmouth, Woods Hole, MA 02543

Drydock and Overhaul Services for the M/V Sankaty
Infrastructure
Results
$821,679 est. value
Woods Hole, MA

Reported 02/18/2022 12:00 AM
Project Title

Fender Pile Replacement at Macmillan Pier Provincetown

Physical Address View project details and contacts
City, State (County) Provincetown, MA 02657   (Barnstable County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $15,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Macmillan Pier is located in Provincetown, MA. The project scope consists of the labor, equipment and materials to remove the existing timber fender piles, modify the existing timber chock and wale as required, purchase and install 12” dia. greenheart fender piles (each 45 feet long), install town supplied composite piles, reinstall existing UHMW strips, and install plastic fender pile caps on each installed pile. Replacement of timber chokes, wales and curbs. Steel ladders and pile guide repairs.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents