Similar Projects
Last Updated | 04/25/2023 02:36 AM |
Project Title | Piedmont Elementary schools Boiler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Oakland, CA 94611 (Alameda County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $436,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bids must be accompanied by a bidder s bond, cashier s check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. Scope of work includes but not limited to Description: Demo, and removal of the existing boiler and related controls from the boiler room. Full inspection of the existing condensation pump for its condition and compliance with the new system (replace if necessary). Abatement of all hazardous materials based on ACC environmental report attached and dispose of all debris. Installation of 2 MBH Cast Iron Sectional 2,000 MBH Cast Iron Sectional. Installation of pressure gauges. Installation of the outdoor air sensor for the boiler lockout. Installation of the boiler related proper safeties. The bidder shall have a Class C4 - Boiler, Hot Water Heating and Steam Fitting Contractor license and shall maintain that license in good standing through Completion of the Contract and all applicable warranty periods. The Owner reserves the right to add or deduct any of the additive or deductive items after the lowest responsible and responsive bidder is determined |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |