Similar Projects
City Hall Redevelopment - City of North Miami
New Construction, Renovation - 185,000 SF
Conception
$20,000,000 est. value
North Miami, FL 33161

Judicial Complex North Wing Exterior Elevators - Broward County
Renovation
Conception
$2,073,000 CJ est. value
Fort Lauderdale, FL 33301

New Palm Bay City Hall Building E
New Construction - 31,500 SF
Design
Palm Bay, FL 32909

CityPlace Homestead - Phase 1
Demolition, New Construction, Infrastructure
Design
$95,000,000 CJ est. value
Homestead, FL 33030

RFQ - Construction Manager at Risk (CMaR) Services for New City Hall
New Construction, Renovation, Infrastructure - 107,742 SF
Bidding
$45,000,000 CJ est. value
Clearwater, FL 33756

Vassar B Carlton Historic Titusville Courthouse Boiler and Pump Replacement
Renovation
Bidding
$300,000 CJ est. value
Titusville, FL 32796

Clerk of Courts Winter Park Courthouse at Metric Drive
Renovation - 33,915 SF
Post-Bid
$12,000,000 CJ est. value
Winter Park, FL 32789

Main County Courthouse (MCCH) - Security Partition Install
Term Contract
Post-Bid
West Palm Beach, FL 33401

Juvenile Justice Courthouse
New Construction - 57,986 SF
Results
$10,000,000 est. value
Panama City, FL

Tarpon Springs City Clerks Office Renovation
Renovation - 2,500 SF
Results
$1,000,000 to $2,000,000 est. value
Tarpon Springs, FL 34689

New Courtroom at the DeLand Courthouse
New Construction
Construction
$1,500,000 est. value
DeLand, FL 32724

New Juvenile Justice Courthouse Addition
Addition, Infrastructure, Renovation - 28,993 SF
Construction
$12,990,000 CJ est. value
Panama City, FL 32401

RFQ D/B - New U.S. Courthouse, Fort Lauderdale, FL
LEED Certification, New Construction, Infrastructure - 252,000 SF
Pending Verification
$196,308,343 CJ est. value
Fort Lauderdale, FL 33316

Pines City Center Phase 4 / HCA Medical Office Building
Demolition, New Construction, Infrastructure - 249,700 SF
Pending Verification
$25,000,000 CJ est. value
Pembroke Pines, FL 33026

Judicial Complex Courthouse Drive Perimeter Security - Broward County
Infrastructure
Conception
$4,501,000 CJ est. value
Fort Lauderdale, FL 33301

Last Updated 10/06/2023 03:09 PM
Project Title

Collier County Courthouse Cable Infrastructure Rewiring

Physical Address View project details and contacts
City, State (County) Naples, FL 34112   (Collier County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $3,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Collier County Courthouse Cable Infrastructure Rewiring Each bid shall be accompanied by a certified or cashier's check or a Bid Bond in an amount not less than five percent (5%) of the total Bid to be retained as liquidated damages in the event the Successful Bidder fails to execute the Agreement and file the required bonds and insurance within ten (10) calendar days after the receipt of the Notice of Award. The Successful Bidder acknowledges and agrees that it shall execute the Agreement in the form attached hereto and incorporated herein. The Successful Bidder shall be required to furnish the necessary Payment and Performance Bonds, as prescribed in the General Conditions of the Contract Documents. All Bid Bonds, Payment and Performance Bonds, Insurance Contracts and Certificates of Insurance shall be either executed by or countersigned by a licensed resident agent of the surety or insurance company having its place of business in the State of Florida. Further, the said surety or insurance company shall be duly licensed and qualified to do business in the State of Florida. Attorneys-in-fact that sign Bid Bonds or Payment and Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. The Successful Bidder shall be required to finally complete all Work within three hundred and five (305) calendar days from and after the Commencement Date specified in the Notice to Proceed. The final completion days includes substantial completion days of two hundred and seventy-five (275) calendar days, with an additional thirty (30) calendar days to final completion. Should Contractor fail to achieve Substantial Completion within the number of calendar days established herein, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, two thousand one hundred and three dollars ($2,103.00) for each calendar day thereafter until Substantial Completion is achieved. Unless otherwise specified, work will be limited to the hours of 7:00 a.m. to 7:00 p.m., Monday through Friday. The Owner reserves the right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents, and to postpone the award of the contract for a period of time which, however, shall not extend beyond one hundred eighty (180) days from the bid opening date without the consent of the Successful Bidder.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents