Similar Projects
Central Division - Asphalt Paving Maintenance
Post-Bid

Site Paving
Post-Bid
Elgin, IL 60120

(1.937-Mile) Improvement Consists of Crack Cleaning and Sealing in the Existing Concrete Pavement Between Traffic Lanes, Curb and Gutter, Restriping Pavement Marking
Results
IL

Bolz Road Reconstruction from Amarillo Drive to Kennedy Drive
Results
Carpentersville, IL 60110

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

VNA Health Care Parking Area
Alteration
Construction
Aurora, IL 60506

Asphalt
Term Contract
Post-Bid
Saint Charles, IL

National Tool Driveway
Results
Less than $261,459 est. value
East Dundee, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Kane County Resurfacing
Results
Saint Charles, IL

2021 Street Program
Post-Bid
Elburn, IL

2021 Kane County Chip Seal
Results
Saint Charles, IL

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

Ellithorpe Road Culvert Replacement
Results
Burlington, IL 60140

Roadway Resurfacing
Post-Bid
Saint Charles, IL

Last Updated 05/25/2022 09:49 AM
Project Title

2022 Kane County Resurfacing #2

Physical Address View project details and contacts
City, State (County) IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing various roadway sections within Kane County including Huntley Road, Corron Road, and Bowes Road. This work shall consist of the placement of Bituminous Materials (Tack Coat), Leveling Binder, Hot Mix Asphalt Surface Course, Hot Mix Asphalt Surface Removal, Bituminous and Aggregate Shoulder placement, Class D Patching, Detector Loop Replacement, ADA Improvements, Combination Concrete Curb & Gutter Removal and Replacement, Short-term and Permanent Pavement Markings and all incidental, appurtenant and collateral work therefor (collectively the “project”) necessary to complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents