Similar Projects
Albany College of Pharmacy and Health Sciences Renovation
Renovation - 154,000 SF
Conception
$1,500,000 est. value
Albany, NY 12208

Physics Building Physics Laboratory Renovation Room 009 at University of Albany
Renovation
Post-Bid
$550,000 to $650,000 est. value
Albany, NY 12222

Construction Services Requirements Contracts
Renovation
Post-Bid
Albany, NY

Schuyler Building Phase IV - Interior South Wing at SUNY Albany
Renovation
Results
$20,000,000 to $25,000,000 est. value
Albany, NY 12201

Construction Manager Term Agreement - North Region
Term Contract
Results

Rehabilitation Toilet Rooms for ADA - Campus Center, Humanities and Social Science at SUNY Albany
Construction
$2,500,000 to $5,000,000 est. value
Albany, NY 12201

SUNY Albany Renovate Gym and Infill Pool - PE Building
Renovation
Construction
$5,000,000 to $10,000,000 est. value
Albany, NY 12206

University at Albany SEFCU Arena Building 105 Renovation
Renovation
Post-Bid
$1,000,000 est. value
Albany, NY 12206

Construction Manager Term Agreement - South Region
Term Contract
Results

Renovate Lecture Center - Phase IV at SUNY Albany
Renovation
Construction
$5,000,000 to $10,000,000 est. value
Albany, NY 12222

Job Order Contracting - Area 7 and 8
New Construction
Post-Bid
$1,000,000 to $2,000,000 est. value
Albany, NY

Renovate Massry Center - BB 001 Computer Class Lab Digital Forensics and Cyber Security
Renovation
Results
Albany, NY 12222

Toilet Rooms for ADA Rehabilitation - Biology, Chemistry and Physics at SUNY Albany
Renovation
Results
Albany, NY 12222

Emerging Technology and Entrepreneurship Complex Break-Out Project 1 at SUNY Albany
Renovation
Results
Albany, NY 12203

Podium Campus Center Roof Replacement - Uptown Campus at SUNY Albany
Alteration
Results
$2,000,000 to $2,500,000 est. value
Albany, NY 12222

Last Updated 08/29/2022 10:57 PM
Project Title

SUNY Albany Rehab Plaza - 5th Floor South

Physical Address View project details and contacts
City, State (County) Albany, NY 12206   (Albany County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $4,128,000 [brand] Estimate
Plans Available from Copy Center - 05/25/22
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 24, 2022,this project has not yet been awarded. A timeline for award has not yet been established. The work of this single bid project includes general interior removals and reconstruction, fire suppression, plumbing HVAC, electrical, and abatement work. 1. Removal of existing electrical equipment as indicated on Drawings. 2. Reuse existing electric service and power distribution system for temporary power for construction purposes. 3. Provision of a new underground electric service and power distribution system as needed. 4. Coordinate new electric service with National Grid. 5. Packaged engine generator system and emergency power distribution system. 6. Lighting, power and communications systems for the alterations and areas shown. 7. Outdoor site and security lighting systems. 8. Wiring devices and branch circuitry in areas shown. 9. Power wiring systems for mechanical and miscellaneous electrical equipment, including existing kitchen, etc. 10. Raceway system for telephone and data cabling. 11. Fire Alarm System. 12. IP Clock and Program system. 13. IP Sound system. 14. Intercom and entrance control system. 15. All necessary cutting, patching and firestopping. 16. Excavation and backfill. 17. Miscellaneous items shown and/or specified. All bidders must present evidence of skill, experience and financial qualifications per Information to Bidders, Section 7 of the project specs. Subcontracting is permitted (Section 2.18 of SUCF Agreement). Principal subcontractors must be named within 48 hrs after bid opening per Information for Bidders Section 8. Bidders must submit within 48 hrs either certification of its NYS VendRep questionnaire (preferred) or a signed and notarized paper CCA2 form (Version 9/13 only), Attachments A, B, and C, Appendix A form, work descriptions, and preliminary project schedule. EEO goals for this project: 6% minority workforce and 3% female workforce Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 12% Women Owned Sub-Contracting Goal: 18% Service-Disabled Veteran-Owned Business Contracting Goal: 3% Contract term: 426 calendar days after receipt of the Notice to Proceed Estimated Range -$5,000,000 - $10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Addendum #1-#3 have been issued as of 7-6-2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents