Similar Projects
Construction Services for The Second Controllable Grid Interface (CGI) Project at The NREL Flatirons Campus
New Construction
Post-Bid
Boulder, CO

Request For Information: Steel Structures for Western Area Power Administration (WAPA)
New Construction, Term Contract
Post-Bid

Midway KV1A Replacement
New Construction
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Cardnell Substation Construction - Installation
Results
Glenwood Springs, CO 81601

Design-Build of "Eastside" Distribution Substation
Term Contract
Construction
Fountain, CO 80817

Rattlesnake Solar - Hudson
New Construction
Construction
Hudson, CO

SEP Horizon Three Phase Variable Shunt Reactor
New Construction
Post-Bid
Colorado Springs, CO

Horseshoe Electric Substation Improvement
Results
Loveland, CO 80537

Shunt Reactor for Hayden Substation
Term Contract
Post-Bid
Hayden, CO

Poncha Substation Stage 04
Results
$500,000 to $1,000,000 est. value
Poncha Springs, CO

CMAFS Substation
Renovation
Post-Bid
Colorado Springs, CO 80926

Sep Briargate Substation Control Enclosure
New Construction
Results
CO

Beaver Creek Substation And Cheyenne Substation Breaker Replacements
Renovation
Post-Bid
Avon, CO - Cheyenne, WY 81620

Horizon Substation Control Enclosure
New Construction
Results
CO

Rock Island Substation, Physical Protection Improvements
New Construction
Results
Colorado Springs, CO 80909

Last Updated 02/25/2022 01:21 PM
Project Title

Strontia Springs PRV Station Improvements

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,800,000 to $3,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under the Strontia Springs PRV Station Improvements consists of furnishing all labor, materials equipment, tools, supplies to complete the following detailed work.A. The proposed Work, (primarily at the existing Strontia Pressure Reducing Valve (PRV) Station, and secondarily at the existing Strontia Springs Reservoir Intake Tower), provides for the general rehabilitation and/or replacement of various items and systems, including in the areas of: sitework, building structure/architectural, civil/structural, mechanical/HVAC, new electrical power feed, new standby generator, new SCADA control panel and process instrumentation, access control and security system, safety systems.

Details

Electric Substation, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents