Similar Projects
600 Alton f/k/a 500 Alton
New Construction
Design
Miami Beach, FL 33139

Development of Dolphin Station Property
Bidding
Miami, FL 33128

Quail Roost Park-New Playground Expansion and Surface Conversion
Bidding
Less than $592,000 est. value
Miami, FL 33157

Tamiami, Tropical and Ives Estates Tennis Center Operations
Post-Bid
Miami, FL

Judge Arthur Snyder Tennis Center and Daniel Diefenbach Park
Post-Bid
North Miami Beach, FL 33162

Briar Bay Park - Park Improvements
Results
Less than $195,000 est. value
FL

Zoo Miami - Kitchen and Grain Warehouse Renovation
Results
Less than $70,000 est. value
Miami, FL 33177

Tree Island Park - Phase 1 Park Development
Post-Bid
Less than $4,465,700 est. value
Miami, FL 33194

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Homestead Station 102619
Post-Bid
Homestead, FL 33030

Underline Phase 1 Brickell Backyard
Results
Less than $11,734,657 est. value
FL

Rides Installation and Operation at Zoo Miami
Post-Bid
Miami, FL 33177

Hurricane Irma - Matheson Hammock Park - Building Repairs
Results
Less than $365,100 est. value
Miami, FL 33156

Pawcrest Dog Park Entryway
Post-Bid
Pinecrest, FL 33156

Arch Creek Park - Shelter Replacement
Results
$92,800 est. value
Miami, FL

Reported 03/21/2019 12:00 AM
Project Title

Construction of Park

Physical Address View project details and contacts
City, State (County) Homestead, FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Scope of Work will consist of converting an existing landscaped open area of approximately 66,000 square feet in size into a neighborhood recreational park containing three distinct children's play areas, jogging path with multiple bench seating areas, new parking area, site drainage improvements for the new parking area and new site lighting throughout the entire park. Contractor will be required as part of the Scope of Work to remove existing sodded areas, topsoil, and subsoils in all areas being improved. Provide minimum 8"of new compacted lime rock base below the new parking areas,sidewalks, seating areas. Jogging path and children's play areas.
Details
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents