Similar Projects
National Corvette Museum Expansion
Addition, Demolition, Infrastructure, Renovation - 30,000 SF
Design
$12,000,000 CJ est. value
Bowling Green, KY 42101

National Corvette Museum Expansion
Addition, Demolition, Infrastructure, Renovation - 30,000 SF
Design
$12,000,000 CJ est. value
Bowling Green, KY 42101

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Playground Addition
Infrastructure
Bidding
$300,000 CJ est. value
Bowling Green, KY 42101

Production Avenue Extension and Fred Madison Realignment
Post-Bid
Bowling Green, KY

Warren County Road
Infrastructure
Post-Bid
Bowling Green, KY 42101

Asphalt Resurfacing - Scottsville Road (Us 231) (Mp 10.000)
Infrastructure
Results
Bowling Green, KY 42128

Asphalt Resurfacing - Various Routes in Warren County
Infrastructure
Results
Bowling Green, Woodburn, KY 42170

Total Fitness Connection Renovation and Expansion
Addition, Renovation, Infrastructure - 32,462 SF
Construction
$3,500,000 CJ est. value
Bowling Green, KY 42101

Henry Hardin Cherry Hall Renovation - Western Kentucky University
Renovation, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Bowling Green, KY 42101

Brookwood Drive Residential Subdivision
New Construction, Infrastructure
Pending Verification
$106,000,000 CJ est. value
Bowling Green, KY 42101

Buc-ee's / Smiths Grove
New Construction, Infrastructure - 54,000 SF
Design
$30,000,000 CJ est. value
Smiths Grove, KY 42171

Westen Street Intersection Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Bowling Green, KY 42104

Improve Site Rear Plaza
Infrastructure
Post-Bid
Bowling Green, KY 42101

Bowling Green High School Phase 4 - Early Site Package
Demolition
Results
Bowling Green, KY 42104

Last Updated 02/17/2023 07:39 AM
Project Title

Address Pavement Condition of I-065 Both Direction(S) From Milepoint 13.711 to Milepoint 25

Physical Address View project details and contacts
City, State (County) Bowling Green, KY 42103   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $13,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Address Pavement Condition of I-065 Both Direction(S) From Milepoint 13.711 to Milepoint 25 Milepoints: From MP 13.711 To 25.000 Purpose and Need: Am-pavement (Int)(P) As of February 17, 2023, the project is in Final Planning status. Anticipated Letting Year is 2023. KYTC - Address Pavement Condition of I-065 Both Direction(S) From Milepoint 13.711 to Milepoint 25 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents