Similar Projects
Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

3356 Peachtree Road Buckhead Residential Tower
New Construction, Infrastructure
Conception
$75,000,000 CJ est. value
Atlanta, GA 30326

FIFTY Tower
New Construction, Infrastructure
Design
$450,000,000 CJ est. value
Atlanta, GA 30308

First United Methodist Church Mixed-use Development
Demolition, New Construction, Infrastructure, Build-out, Renovation
Design
$50,000,000 CJ est. value
Atlanta, GA 30308

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
College Park, GA 30337

980 Crest Valley Drive Stormwater Improvement Project
Infrastructure
Results
$279,562 CJ est. value
Atlanta, GA 30327

I-285 Westbound Auxiliary Lane Extension
Infrastructure
Results
GA

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Medlock Shops / Johns Creek
New Construction, Infrastructure - 6,200 SF
Construction
$1,600,000 CJ est. value
Johns Creek, GA 30097

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 82,091 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Expansion of Tech Square, Phase IIIA
Demolition, Infrastructure, Renovation - 119,000 SF
Pending Verification
$40,000,000 CJ est. value
Atlanta, GA 30334

Abernathy North Greenway Upgrades - City of Sandy Springs
Infrastructure
Conception
$1,000,000 est. value
Sandy Springs, GA 30328

Parkwood / Hardee Street
Demolition, New Construction, Infrastructure - 8,745 SF
Design
$12,900,000 CJ est. value
Atlanta, GA 30307

RFQ Denmark Library - Forsyth County
New Construction, Infrastructure - 32,000 SF
Post-Bid
$11,900,000 CJ est. value
Alpharetta, GA 30004

Last Updated 08/22/2023 01:43 PM
Project Title

RFQ D/B - Design-Build-Finance-Maintain Agreement for the State Route (SR) 400 Express Lanes P3 Project

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30324   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $1,700,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of approximately 16 miles of express lanes along SR 400 between the Metropolitan Atlanta Rapid Transit Authority ("MARTA") North Springs Station at Exit 5C in Fulton County and approximately 0.9 miles north of the SR 400/McFarland Parkway Interchange at Exit 12 in Forsyth County (Project MSL00-0001-00(757), P.I. No. 0001757). Ramps and a collector distributor (C/D) system that is currently under construction will connect the current general purpose lanes on I-285 to the SR 400 express lanes. The Project will add two express lanes in each direction from the MARTA North Springs Station to McGinnis Ferry Road and one express lane in each direction from McGinnis Ferry Road to the Project terminus, north of McFarland Parkway. There are eight northbound access points consisting of three direct access interchanges, two ingress locations, one egress location, and two ingress/egress locations and there are nine southbound access points consisting of three direct access interchanges, two ingress locations, three egress locations, and one ingress/egress location, as shown in Exhibit 2 (Project Map). There are also two direct connections to transit services in the northbound and southbound directions. The SR 400 express lanes are anticipated to be physically separated with plastic delineators from the general purpose lanes with limited entrances and exits. The Developer may have the opportunity to add, remove, or modify access points or to change the type of separation between the general purpose lanes and the express lanes. The Project is a critical piece of a larger construction effort that will provide reliable travel time options on SR 400 and I-285. SRTA and GDOT anticipate that the Project Agreement will (among other things): (a) obligate the Developer to: (i) develop, design and construct the Project; (ii) provide financing for the Project; and (iii) operate, maintain and toll the Project; (b) grant the Developer the right to receive toll revenues collected from users of the tolled portions of SR 400 for a set 50 year operations, maintenance and tolling period, subject to any revenue sharing with, or other payments to be made to, the Authority; (c) provide relevant parameters for tolling; and (d) set out SRTA's obligations, including pursuant to a Tolling Services Agreement to be included as an exhibit to the Project Agreement and executed concurrently.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents