Similar Projects
Port Fourchon Navigation Channel, Maintenance Dredging #22-2, Lafourche Parish, Louisiana (ED-22-010)
Infrastructure
Design
$10,000,000 CJ est. value
Golden Meadow, LA 70357

RFP - Environmental Consulting Services in Support of Louisiana International Terminal Planning and Permitting Professional Services
Term Contract
Bidding
New Orleans, LA 70112

2022 Environmental Emergency Response and Remediation Services
Term Contract
Sub-Bidding
Lafayette, LA 70501

Structures Ready for Demolition/Removal
Demolition, Infrastructure
Sub-Bidding
$90,000 CJ est. value
Ruston, LA 71270

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Drainage Pump Station 13 Asbestos Abatement
Alteration
Results
New Orleans, LA 70131

Drainage Pump Station 13 Asbestos Abatement
Alteration
Results
New Orleans, LA 70131

Water and Wastewater Treatment Plants Building Demolition
Demolition, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Lake Charles, LA 70601

Asbestos Abatement, Lead and Avian Removal Project
Alteration
Post-Bid
Lafayette, LA

Water Monitoring System - DEQ
Alteration
Results
Baton Rouge, LA 70802

Culvert Bid
Term Contract
Sub-Bidding
Jonesville, LA 71343

Comprehensive Remediation Services Under Parish REP Guidance
Alteration
Post-Bid
LA

Removal of Asbestos Containing Materials Dormitory 3 Villa Feliciana Geriatric Hospital
Alteration
Results
Jackson, LA 70748

Environmental Services
Term Contract
Sub-Bidding
Lafayette, LA 70501

Last Updated 11/22/2022 09:35 AM
Project Title

Port Improvements to Fournet Street Tank Demolition and Remediation

Physical Address View project details and contacts
City, State (County) Lake Charles, LA 70601   (Calcasieu County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $758,099 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Proposal Guaranty: 5% of Amount of Bid Bids must be submitted on the forms provided by the Contracting Agency, must be prepared in accordance with Section 2 of the 2018 Edition of the Louisiana Department of Transportation and Development, Office of Multimodal Commerce, General Provisions and must include all the information required by the bid form. Bid forms are available from the Engineer and will not be issued later than 24 hours prior to the time set for opening the bids. Each bid shall include a proposal guaranty in an amount not less than specified above. Contract Documents may also be downloaded at Portal. The contract will be awarded to the lowest responsible bidder without discrimination on grounds of race, color, sex or national origin. Disadvantaged businesses will be afforded full opportunity to submit bids. The award of a contract, if awarded, will be made to the lowest qualified bidder whose proposal complies with all requirements prescribed within 45 calendar days after opening proposals. However, when the contract is to be financed by bonds which are required to be sold after receipts of bids, or when the contract is to be financed in whole or part by federal or other funds not available at the time bids are received, the time will not start until receipt of federal and/or state concurrence or concurrence of the other funding source. Award will be within 30 calendar days after the sale of bonds or receipt of concurrence in award from federal and/or state agency or other funding source. The successful bidder will be notified by letter mailed to the address shown in the proposal that the bidder is awarded the contract. The provisions and requirements of LA R.S. 382212; and those stated in the Bidding Documents shall not be waived by any entity, per LA R.S. 3822.12.B(1) as revised by ACT No. 759. Neither can any or all bids be rejected, other than for just cause as allowed by LA R.S. 382214.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents