Similar Projects
First Street Pond and Wastewater Pump Station
New Construction
Bidding
Grants, NM

Lift Station 1 Rehabilitation and New Force Main
Post-Bid
Rio Rancho, NM 87124

Equip Brandy Well 1, an Existing Well with a Solar Pumping System
Post-Bid
Cuba, NM 87013

North Main Sewer Pump Station
Results
Aztec, NM 87410

Effluent Loadout Station
Results
Less than $311,420 est. value
Los Lunas, NM

Construction of Port of Entry Fire Line, Tank, and Booster Pump Station
Post-Bid
Columbus, NM 88029

Wastewater Lift Station Maintenance and Repair Services
Results
Las Cruces, NM 88007

Construction of Lift Station Improvements
Post-Bid
Estancia, NM 87016

Tank 4 to Tank 1 Booster Pump Station and Transmission Line
Results
Santa Fe, NM 87508

Band Replace Sewer and Water System
Post-Bid
$500,000 to $1,000,000 est. value
Los Alamos, NM 87544

Valley Water and Sanitation District Booster Station
Results
Kirtland, NM 87417

Goat Summit Booster Station
Post-Bid
Mescalero, NM

Metro Verde Lift Station
Results
Las Cruces, NM 88004

Glenwood Gila Trout Facility
New Construction
Post-Bid
Glenwood, NM

Llano Lift Station Control Upgrades
Results
Aztec, NM 87410

Last Updated 01/07/2020 11:56 AM
Project Title

NGWSP 4c-8

Physical Address View project details and contacts
City, State (County) Shiprock, NM   (San Juan County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Navajo-Gallup Water Supply Project (NGWSP) Block 4c through 8: is a major infrastructure project that once constructed, will convey a reliable municipal and industrial water supply from the San Juan River to the eastern section of the Navajo Nation, southwestern portion of the Jicarilla Apache Nation, and the city of Gallup, New Mexico via about 280 miles of pipeline, several pumping plants, and two water treatment plants. Work for this reach of pipeline (4C-8) begins at proposed pumping plant 3 approximately 20-miles south of Shiprock, along east side of US 491 approximately 29-miles south and terminates in the Naschitti Chapter Boundary, approximately 43-miles north of Gallup. All work is in San Juan Country on Navajo Tribal Trust land.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents