Similar Projects
HAAF Ramp Condensing Unit Replacement
Alteration
Bidding
$517,635 est. value
Minneapolis, MN 55415

HVAC and Mechanical Products
Term Contract
Post-Bid

J041--Chiller Maintenance 36C26318f0324 - 618C00184 - (Va-21-00015466)
Post-Bid
Minneapolis, MN

Madison Elementary School HVAC Replacement and Deferred Maintenance - Phase 2
Results
Blaine, Minneapolis, MN 55434

Hennepin County Public Works -CMED Cooling
Results
Medina, MN 55340

2021 Concourse B Heating Upgrades P1
Renovation
Post-Bid
Minneapolis, MN

Braemar Ice Arena Dehumidification Upgrade
Renovation
Results
$240,000 est. value
Edina, Minneapolis, MN

2021 Terminal 2 Preconditioned Air Units Replacement
Post-Bid
MN 55111

Water Treatment Plant Rooftop Unit Replacements
Results
Bloomington, MN

Wayzata Oakwood Elementary Kitchen HVAC Replacement
Post-Bid
Plymouth, MN 55447

MnDOT Mechanics Shop HVAC Replacement
Renovation
Results
$125,000 est. value
Richfield, MN 55423

Boiler Replacements
Renovation
Post-Bid
Bloomington, Minneapolis, MN 55431

West Bank Chilled Water Interior Scope
Alteration
Results
$1,100,000 est. value
Minneapolis, MN 55455

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Condensing Unit and Coil Replacement
Alteration
Results
Minneapolis, MN 55431

Reported 05/26/2022 12:00 AM
Project Title

Health Services Building VFD Motors and Drives - Phase 2

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55415   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $530,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 2 of the Hennepin County Health Services Building Smoke Control will complete the variable speed drive and motor replacement and control repairs to the central modular air handling units on each floor. Remaining supply and return fan variable speed controllers to be replaced with new variable frequency drive. Remaining supply and return fan motors to be replaced. Remaining air handling unit building automation controllers and pneumatics to be replaced and integrated into existing fire alarm system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents